Evolt · EV charging site
Howard Street
Howard Street, Glossop, SK13 8HS
Howard Street is an EV charging site in Glossop, Derbyshire, run by Evolt. All 4 of its sockets are 100 kW CCS, and the price is listed as £0.79/kWh. 3 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Howard Town Shopping Park (POGO), 10 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Evolt
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.79/kWh(from Open Charge Map, 23 Mar 2023)
- Phone (from Open Charge Map)
- +448082813508
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Howard Street (Evolt)?
The listed price is £0.79/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Howard Street (Evolt)?
Up to 100 kW DC via CCS.
How many charging sockets does Howard Street (Evolt) have?
4 charging sockets: 2 × 100 kW CCS, 2 × 100 kW CCS.
Who operates Howard Street?
Howard Street is on the Evolt network. For site issues, the operator lists +448082813508.
Where is the nearest other charger with 50 kW or more to Howard Street (Evolt)?
Howard Town Shopping Park (POGO) is 10 yards away in a straight line, with up to 100 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Howard Street (Evolt)?
A typical 10–80% rapid charge takes about 36 min on the 100 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Howard Street (Evolt)?
A typical 10–80% rapid charge takes about 29 min on the 100 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Howard Street (Evolt)?
A typical 10–80% rapid charge takes about 43 min on the 100 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Howard Town Shopping Park
- Municipal Buildings
- Edward Street Car Park - HPBC
- Windy Harbour Farm Hotel
- Station Road Car Park
- Hattersley District Centre
- Cheapest nearby
- Hattersley District Centre · 59p per kWh · 300 kW · 3.1 mi
- Fastest nearby
- Hattersley District Centre · 300 kW · 3.1 mi