Evolt · EV charging site
Mill Street
Mill Street, Buckley, LL15 1HN
Mill Street is an EV charging site in Buckley, County of Flintshire, run by Evolt. All 4 of its sockets are 7 kW Type 2, and the price is listed as £0.35 + £0.45/kWh. 2 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Morrisons Denbigh (GeniePoint), 6.6 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Evolt
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.35 + £0.45/kWh(from Open Charge Map, 4 Sept 2023)
- Phone (from Open Charge Map)
- +448082813508
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Mill Street (Evolt)?
The listed price is £0.35 + £0.45/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Mill Street (Evolt)?
Up to 7 kW AC via Type 2.
How many charging sockets does Mill Street (Evolt) have?
4 charging sockets: 2 × 7 kW Type 2, 2 × 7 kW Type 2.
Who operates Mill Street?
Mill Street is on the Evolt network. For site issues, the operator lists +448082813508.
Where is the nearest charger with 50 kW or more to Mill Street (Evolt)?
Morrisons Denbigh (GeniePoint) is 6.6 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Mill Street (Evolt)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Mill Street (Evolt)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Mill Street (Evolt)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Cheapest nearby
- Pod Point Tesco Superstore - Ruthin · 44.4p per kWh · 7 kW · 0.5 mi
- Fastest nearby
- Ruthin Craft Centre car park · 22 kW · 0.4 mi