Evolt · EV charging site
New Street
New Street, Tewkesbury, WR8 0JJ
New Street is an EV charging site in Tewkesbury, Gloucestershire, run by Evolt. All 3 of its sockets are 7 kW Type 2, and the price is listed as £0.26/kWh. No other charging site is listed within a mile, and the nearest site with 50 kW or more is EH - Roadchef Strensham Northbound (GRIDSERVE), 2.6 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Evolt
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- £0.26/kWh(from Open Charge Map, 6 Apr 2022)
- Phone (from Open Charge Map)
- +448082813508
- Notes
- access via web pay or RFID
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at New Street (Evolt)?
The listed price is £0.26/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at New Street (Evolt)?
Up to 7 kW AC via Type 2.
How many charging sockets does New Street (Evolt) have?
3 charging sockets: 1 × 7 kW Type 2, 1 × 7 kW Type 2, 1 × 7 kW Type 2.
Who operates New Street?
New Street is on the Evolt network. For site issues, the operator lists +448082813508.
Where is the nearest charger with 50 kW or more to New Street (Evolt)?
EH - Roadchef Strensham Northbound (GRIDSERVE) is 2.6 miles away in a straight line, with up to 180 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at New Street (Evolt)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at New Street (Evolt)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at New Street (Evolt)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Cheapest nearby
- EH - Roadchef Strensham Northbound · 92p per kWh · 180 kW · 2.6 mi
- Fastest nearby
- EH - Roadchef Strensham Southbound · 360 kW · 3.3 mi