Evolt · EV charging site
Newtown Road Car Park
Newtown Road Carpark, Great Malvern, WR14 1EP
Newtown Road Car Park is an EV charging site in Great Malvern, Worcestershire, run by Evolt. All 6 of its sockets are 7 kW Type 2. 3 other charging sites are listed within a mile, and the nearest site with 50 kW or more is MFG (GeniePoint), 1.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Evolt
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- £0.57/kWh. Parking fees apply(from Open Charge Map, 28 Mar 2024)
- Phone (from Open Charge Map)
- +448082813508
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Newtown Road Car Park (Evolt)?
The listed price is £0.57/kWh. Parking fees apply. Prices can change, so check the price at the charger before you start.
How fast is charging at Newtown Road Car Park (Evolt)?
Up to 7 kW AC via Type 2.
How many charging sockets does Newtown Road Car Park (Evolt) have?
6 charging sockets: 6 × 7 kW Type 2.
Who operates Newtown Road Car Park?
Newtown Road Car Park is on the Evolt network. For site issues, the operator lists +448082813508.
Where is the nearest charger with 50 kW or more to Newtown Road Car Park (Evolt)?
MFG (GeniePoint) is 1.1 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Newtown Road Car Park (Evolt)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Newtown Road Car Park (Evolt)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Newtown Road Car Park (Evolt)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Victoria Road Car Park
- The Council House Carpark, Avenue Road, Malvern WR143AF
- LHS of car park
- MFG
- Geraldine Road
- The Malvern Spa Hotel
- Cheapest nearby
- The Malvern Spa Hotel · 65p per kWh · 50 kW · 1.4 mi
- Fastest nearby
- MFG · 50 kW · 1.1 mi