Norwich Enterprise Centre is an EV charging site in Bowthorpe, Norfolk, run by Evolt. It has a single socket, with CCS and CHAdeMO at up to 50 kW, and the price is listed as 33p/kWh.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** University Drive, NR4 7TJ
- **Area:** Bowthorpe, Norfolk, United Kingdom
- **Coordinates (latitude, longitude):** 52.62612, 1.23913
- **Getting there:** Mo-Su 06:00-02:00

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 50 kW | 1 | Not listed |
| CHAdeMO | 50 kW | 1 | Not listed |
| Type 2 | 43 kW | 1 | Not listed |

- **Price:** 33p/kWh (from Open Charge Map)

## Site information

- **Operator:** Evolt
- **Opening hours:** Not published
- **Access:** Public
- **Payment:** Pay at the charger (from Open Charge Map)
- **Notes:** 1 station (ref SEC. 50047), 2 designated parking bays

## Common questions

### How much does it cost to charge at Norwich Enterprise Centre (Evolt)?

The listed price is 33p/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at Norwich Enterprise Centre (Evolt)?

Up to 50 kW DC via CCS, Type 2, CHAdeMO.

### How many charging sockets does Norwich Enterprise Centre (Evolt) have?

1 charging socket: 1 × 50 kW CCS, 1 × 43 kW Type 2, 1 × 50 kW CHAdeMO.

### Who operates Norwich Enterprise Centre?

Norwich Enterprise Centre is on the Evolt network. For site issues, the operator lists +448082813508.

### How long does a Tesla Model Y Long Range take to charge at Norwich Enterprise Centre (Evolt)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Norwich Enterprise Centre (Evolt)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Norwich Enterprise Centre (Evolt)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Bowthorpe](https://ampmap.co.uk/chargers/united-kingdom/norfolk/bowthorpe)
- [Evolt chargers](https://ampmap.co.uk/networks/evolt)

## Chargers near this site

- [COOP Earlham Green · Plug N Go Ltd](https://ampmap.co.uk/charger/plug-n-go-ltd-coop-earlham-green-uk) - Type 2 7 kW · Earlham Green Lane COOP
- [Norwich Research Park Car Park 1 · Evolt](https://ampmap.co.uk/charger/evolt-network-norwich-research-park-car-park-1-uk) - Type 2 7 kW · Colney Lane
- [NRP Public Carpark Customer Charging · Evolt](https://ampmap.co.uk/charger/evolt-network-nrp-public-carpark-customer-charging-uk) - Type 2 22 kW, Type 2 7 kW · NRP Public Carpark
- [Ella May · ElectRoad](https://ampmap.co.uk/charger/electroad-ella-may-uk) - Type 2 7 kW · Rosalind Franklin Road
- [Shell Recharge EV Waitrose - Norwich](https://ampmap.co.uk/charger/shell-recharge-ev-waitrose-norwich-uk) - CCS / CHAdeMO 50 kW, Type 2 7 kW · Eaton Centre, Church Ln · From 79p/kWh
- [The Jubilee Centre · ElectRoad](https://ampmap.co.uk/charger/electroad-the-jubilee-centre-uk) - CCS 45 kW, CHAdeMO 45 kW · Walpole Crescent

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/evolt-network-norwich-enterprise-centre-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 12 May 2019).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.