Evolt · EV charging site
Post Office Lane
Post Office Lane, Rhyl, LL16 3UN
Post Office Lane is an EV charging site in Rhyl, Denbighshire, run by Evolt. All 4 of its sockets are 22 kW Type 2, and the price is listed as £0.35 + £0.45/kWh. 1 other charging site is listed within a mile, and the nearest site with 50 kW or more is Morrisons Denbigh (GeniePoint), 0.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Evolt
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.35 + £0.45/kWh(from Open Charge Map, 10 Jan 2024)
- Phone (from Open Charge Map)
- +448082813508
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Post Office Lane (Evolt)?
The listed price is £0.35 + £0.45/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Post Office Lane (Evolt)?
Up to 22 kW AC via Type 2.
How many charging sockets does Post Office Lane (Evolt) have?
4 charging sockets: 2 × 22 kW Type 2, 2 × 22 kW Type 2.
Who operates Post Office Lane?
Post Office Lane is on the Evolt network. For site issues, the operator lists +448082813508.
Where is the nearest charger with 50 kW or more to Post Office Lane (Evolt)?
Morrisons Denbigh (GeniePoint) is 0.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Post Office Lane (Evolt)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Post Office Lane (Evolt)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Post Office Lane (Evolt)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Fastest nearby
- Morrisons Denbigh · 50 kW · 0.3 mi