Evolt · EV charging site
Reading Civic Centre, outside Car Park
Simmonds Street, Reading, RG1 6QF
Reading Civic Centre, outside Car Park is an EV charging site in Reading, run by Evolt. Its 2 sockets reach up to 44 kW, with CCS and CHAdeMO at the top speed. 16 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Rivermead Leisure Centre, 0.9 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Evolt
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Phone (from Open Charge Map)
- +448082813508
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Reading Civic Centre, outside Car Park (Evolt)?
Up to 44 kW DC via CCS, CHAdeMO, Type 2.
How many charging sockets does Reading Civic Centre, outside Car Park (Evolt) have?
2 charging sockets: 1 × 44 kW CCS, 1 × 44 kW CHAdeMO, 1 × 22 kW Type 2, 1 × 44 kW CCS, 1 × 44 kW CHAdeMO, 1 × 22 kW Type 2.
Who operates Reading Civic Centre, outside Car Park?
Reading Civic Centre, outside Car Park is on the Evolt network. For site issues, the operator lists +448082813508.
Where is the nearest charger with 50 kW or more to Reading Civic Centre, outside Car Park (Evolt)?
Rivermead Leisure Centre is 0.9 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Reading Civic Centre, outside Car Park (Evolt)?
A typical 10–80% rapid charge takes about 79 min on the 44 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Reading Civic Centre, outside Car Park (Evolt)?
A typical 10–80% rapid charge takes about 57 min on the 44 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Reading Civic Centre, outside Car Park (Evolt)?
A typical 10–80% rapid charge takes about 74 min on the 44 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Civic Offices Bridge Street
- Pod Point The Oracle Shopping Centre - Holy Brook Car Park (Chargers are located on the top level of the car park)
- Pod Point The Oracle Shopping Centre - The Riverside Car Park (Chargers are located on the top level of the car park)
- Antstey Road
- DRAX_00105
- Q-Park Chatham Place, Reading 7
- Cheapest nearby
- Pod Point The Oracle Shopping Centre - Holy Brook Car Park (Chargers are located on the top level of the car park) · 50.4p per kWh · 22 kW · 0.1 mi