Evolt · EV charging site
Saint John's Business Park
Shuttleworth Lane, Glen Parva, LE17 4HB
Saint John's Business Park is an EV charging site in Glen Parva, Leicestershire, run by Evolt. Its 2 sockets reach up to 50 kW, with CHAdeMO and CCS at the top speed. No other charging site is listed within a mile, and the nearest other site with 50 kW or more is Narborough Arms (Narborough) (evyve), 2.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Evolt
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Phone (from Open Charge Map)
- +448082813508
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Saint John's Business Park (Evolt)?
Up to 50 kW DC via Type 2, CHAdeMO, CCS.
How many charging sockets does Saint John's Business Park (Evolt) have?
2 charging sockets: 2 × 22 kW Type 2, 1 × 50 kW CHAdeMO, 1 × 50 kW CCS.
Who operates Saint John's Business Park?
Saint John's Business Park is on the Evolt network. For site issues, the operator lists +448082813508.
Where is the nearest other charger with 50 kW or more to Saint John's Business Park (Evolt)?
Narborough Arms (Narborough) (evyve) is 2.1 miles away in a straight line, with up to 75 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Saint John's Business Park (Evolt)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Saint John's Business Park (Evolt)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Saint John's Business Park (Evolt)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Cornerhouse Garage
- Narborough Arms (Narborough)
- Weavers Court 3
- Leicester Road Car Park
- Shell Recharge Shell Sutton Elms
- InstaVolt Copt Oak Court
- Cheapest nearby
- Narborough Arms (Narborough) · 85p per kWh · 75 kW · 2.1 mi
- Fastest nearby
- Shell Recharge Shell Sutton Elms · 300 kW · 2.3 mi