Evolt · EV charging site
Severn Road Car Park
Severn Road, Cardiff, CF11 9DX
Severn Road Car Park is an EV charging site in Cardiff, run by Evolt. Both of its sockets are 7 kW Type 2, and the price is listed as £0.31/kWh. 16 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Capital Shopping Park, Cardiff (Osprey Charging), 0.8 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Evolt
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- £0.31/kWh(from Open Charge Map, 2 Oct 2019)
- Phone (from Open Charge Map)
- +448082813508
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Severn Road Car Park (Evolt)?
The listed price is £0.31/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Severn Road Car Park (Evolt)?
Up to 7 kW AC via Type 2.
How many charging sockets does Severn Road Car Park (Evolt) have?
2 charging sockets: 2 × 7 kW Type 2.
Who operates Severn Road Car Park?
Severn Road Car Park is on the Evolt network. For site issues, the operator lists +448082813508.
Where is the nearest charger with 50 kW or more to Severn Road Car Park (Evolt)?
Capital Shopping Park, Cardiff (Osprey Charging) is 0.8 miles away in a straight line, with up to 300 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Severn Road Car Park (Evolt)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Severn Road Car Park (Evolt)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Severn Road Car Park (Evolt)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Fastest nearby
- Harvey Street · 22 kW · 0.3 mi