Evolt · EV charging site
Station Road Cambridge
Station Road, Cambridge, CB1 2LA
Station Road Cambridge is an EV charging site in Cambridge, Cambridgeshire, run by Evolt. It has a single socket, with CCS and CHAdeMO at up to 50 kW, and the price is listed as £0.79/kWh. 4 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is The Red Bull, Newnham (Osprey Charging), 1.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Evolt
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- £0.79/kWh(from Open Charge Map, 4 Nov 2022)
- Phone (from Open Charge Map)
- +448082813508
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Station Road Cambridge (Evolt)?
The listed price is £0.79/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Station Road Cambridge (Evolt)?
Up to 50 kW DC via CCS, CHAdeMO, Type 2.
How many charging sockets does Station Road Cambridge (Evolt) have?
1 charging socket: 1 × 50 kW CCS, 1 × 50 kW CHAdeMO, 1 × 22 kW Type 2.
Who operates Station Road Cambridge?
Station Road Cambridge is on the Evolt network. For site issues, the operator lists +448082813508.
Where is the nearest other charger with 50 kW or more to Station Road Cambridge (Evolt)?
The Red Bull, Newnham (Osprey Charging) is 1.1 miles away in a straight line, with up to 60 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Station Road Cambridge (Evolt)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Station Road Cambridge (Evolt)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Station Road Cambridge (Evolt)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Microsoft Cambridge
- Best Western Plus The Gonville Hotel
- Pod Point The Gonville Hotel, Cambridge
- Adam and Eve Street Car Park - e-taxis only
- Graduate Hotel Cambridge
- Beche Road
- Cheapest nearby
- Pod Point The Gonville Hotel, Cambridge · 34.8p per kWh · 7 kW · 0.4 mi