# Tebay Services Northbound · Evolt

Web page: https://ampmap.co.uk/charger/evolt-network-tebay-services-northbound-uk

Tebay Services Northbound is an EV charging site in Kendal, Cumbria, run by Evolt. Its 6 sockets reach up to 17 kW, with NACS at the top speed.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Orton, CA10 3SB
- **Area:** Kendal, Cumbria, United Kingdom
- **Coordinates (latitude, longitude):** 54.44965, -2.60998
- **Getting there:** Junction 38 of M6 northbound. To access the charger follow the very large "Tesla Charger" signs. You can access it whether from Northbound (the side its on) or Southbound (you are led over a bridge to Northbound). You have to sign in and collect a key at the petrol station forecourt. The key unlocks a padlock on the switch that powers the charger. Charging availability 24 hours.

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| NACS | 17 kW | 1 | Not listed |
| Type 2 | 7 kW | 6 | Not listed |

## Site information

- **Operator:** Evolt
- **Opening hours:** Not published
- **Access:** Public
- **Notes:** EVSE: Tesla HPC and 32Amp outlets

## Common questions

### How fast is charging at Tebay Services Northbound (Evolt)?

Up to 17 kW AC via NACS, Type 2.

### How many charging sockets does Tebay Services Northbound (Evolt) have?

6 charging sockets: 1 × 17 kW NACS, 2 × 7 kW Type 2, 2 × 7 kW Type 2, 2 × 7 kW Type 2.

### Who operates Tebay Services Northbound?

Tebay Services Northbound is on the Evolt network. For site issues, the operator lists +448082813508.

### How long does a Tesla Model Y Long Range take to charge at Tebay Services Northbound (Evolt)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Tebay Services Northbound (Evolt)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Tebay Services Northbound (Evolt)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Kendal](https://ampmap.co.uk/chargers/united-kingdom/cumbria/kendal)
- [Evolt chargers](https://ampmap.co.uk/networks/evolt)

## Chargers near this site

- [Westmorland Tebay Northbound Services · Evolt](https://ampmap.co.uk/charger/evolt-network-westmorland-tebay-northbound-services-uk) - CCS 150 kW, CCS 104 kW · Westmorland Tebay Northbound Services
- [Tebay, UK · Tesla](https://ampmap.co.uk/charger/tesla-penrith-uk-tebay-southbound-supercharger-uk) - CCS 250 kW · M6 Junction 38/39 · From 64p/kWh
- [Tebay Services Southbound · Westmorland Family](https://ampmap.co.uk/charger/westmorland-family-tebay-services-southbound-uk) - CCS 150 kW, CCS 104 kW · Tebay Services Southbound

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/evolt-network-tebay-services-northbound-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 8 Apr 2026).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
