Evolt · EV charging site
Wray Lane Car Park
Wray Lane, Reigate, RH2 0HX
Wray Lane Car Park is an EV charging site in Reigate, Surrey, run by Evolt. It has a single socket, with CHAdeMO and CCS at up to 50 kW, and the price is listed as £2.00 + £0.20/kWh. No other charging site is listed within a mile, and the nearest other site with 50 kW or more is Morrisons - Reigate (GeniePoint), 1.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Evolt
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £2.00 + £0.20/kWh(from Open Charge Map, 24 Jul 2021)
- Phone (from Open Charge Map)
- +448082813508
- Notes
- ABB triple-headed rapid charger.
- Getting there
- Charger is located near Café / Kiosk. No eligibility restrictions. Parking in charging bay limited to 1 hour. Café open 08:00-17:00
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Wray Lane Car Park (Evolt)?
The listed price is £2.00 + £0.20/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Wray Lane Car Park (Evolt)?
Up to 50 kW DC via CHAdeMO, Type 2, CCS.
How many charging sockets does Wray Lane Car Park (Evolt) have?
1 charging socket: 1 × 50 kW CHAdeMO, 1 × 43 kW Type 2, 1 × 50 kW CCS.
Who operates Wray Lane Car Park?
Wray Lane Car Park is on the Evolt network. For site issues, the operator lists +448082813508.
Where is the nearest other charger with 50 kW or more to Wray Lane Car Park (Evolt)?
Morrisons - Reigate (GeniePoint) is 1.5 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Wray Lane Car Park (Evolt)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Wray Lane Car Park (Evolt)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Wray Lane Car Park (Evolt)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Pod Point Sainsbury's Redhill
- Morrisons - Reigate
- Pod Point Belfry Shopping Centre
- Halfords Autocentre Redhill
- B&Q Redhill
- Hillside SF Connect
- Cheapest nearby
- Pod Point Sainsbury's Redhill · Free · 3 kW · 1.5 mi
- Fastest nearby
- Hillside SF Connect · 300 kW · 1.7 mi