Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

evyve · EV charging site

Bay Horse (Ashton-In-Makerfield)

Warrington Road 49-53, Ashton in Makerfield, WN4 9PJ

Bay Horse (Ashton-In-Makerfield) is an EV charging site in Ashton in Makerfield, St. Helens, run by evyve and open 24 hours a day. All 4 of its sockets are 22 kW Type 2, and the published price is £0.65 per kWh. Recorded live status shows it is usually busiest around 5 pm, and Amp Map measured 100% uptime and recorded 30 charging sessions here over the last 30 days. 3 other charging sites are listed within a mile, and the nearest site with 50 kW or more is The Gerard Centre (Be.EV), 0.3 miles away.

Status

4 of 4 available

Checking status…

VerifiedLive status and details from evyve’s data feed. Amp Map updates them automatically.Last synced 20 Nov 2026

Connectors

Type 2 · 22 kW4 connectors · 65p per kWh4 free
Bay Horse 01-A100% reliabilityAvailable
Bay Horse 02-A100% reliabilityAvailable
Bay Horse 03-A100% reliabilityAvailable
Bay Horse 04-A100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
evyve
Opening hours
Open 24 hours
Payment
In the evyve Charge appRFID card
Charger ID
Bay Horse 01-A

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
Type 222 kW65p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 22 kW Type 2~5h 2m · ≈ 55 kWh · ~£36
Tesla Model 3 Rear-Wheel Drive 10–80% · 22 kW Type 2~3h 38m · ≈ 40 kWh · ~£26
Audi Q4 e-tron 50 10–80% · 22 kW Type 2~4h 39m · ≈ 51 kWh · ~£33
Hyundai IONIQ 5 10–80% · 22 kW Type 2~4h 37m · ≈ 51 kWh · ~£33
MG Motor MG4 Trophy 10–80% · 22 kW Type 2~3h 53m · ≈ 43 kWh · ~£28
Hyundai Kona Electric Long Range 10–80% · 22 kW Type 2~5h 38m · ≈ 41 kWh · ~£26
Nissan LEAF 10–80% · 22 kW Type 2~4h 15m · ≈ 28 kWh · ~£18

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Bay Horse (Ashton-In-Makerfield) (evyve)?

The listed price is £0.65/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Bay Horse (Ashton-In-Makerfield) (evyve)?

Up to 22 kW AC via Type 2.

How many charging sockets does Bay Horse (Ashton-In-Makerfield) (evyve) have?

4 charging sockets: 4 × 22 kW Type 2. Live per-socket availability is shown on this page.

Is Bay Horse (Ashton-In-Makerfield) (evyve) open 24/7?

Yes - Bay Horse (Ashton-In-Makerfield) (evyve) is open 24 hours a day, 7 days a week.

When is Bay Horse (Ashton-In-Makerfield) (evyve) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 5 pm and quietest around 11 am. The live status on this page shows what is free before you set off.

How reliable is Bay Horse (Ashton-In-Makerfield) (evyve)?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 30 observed charging sessions.

Who operates Bay Horse (Ashton-In-Makerfield)?

Bay Horse (Ashton-In-Makerfield) is on the evyve network.

Where is the nearest charger with 50 kW or more to Bay Horse (Ashton-In-Makerfield) (evyve)?

The Gerard Centre (Be.EV) is 0.3 miles away in a straight line, with up to 150 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Bay Horse (Ashton-In-Makerfield) (evyve)?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Bay Horse (Ashton-In-Makerfield) (evyve)?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh (~£26 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Bay Horse (Ashton-In-Makerfield) (evyve)?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh (~£33 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: evyve · synced 20 Nov 2026

Amp Map does not take payment. You pay the operator.