evyve · EV charging site
Black Swan (Henley-In-Arden)
High Street 23, Redditch, B95 5AA
Black Swan (Henley-In-Arden) is an EV charging site in Redditch, Worcestershire, run by evyve and open 24 hours a day. It has a single 7 kW Type 2 socket, and the published price is £0.65 per kWh. Recorded live status shows it is usually busiest around 6 pm. No other charging site is listed within a mile, and the nearest site with 50 kW or more is The Bull's Head, Wootton Wawen (Osprey Charging), 2 miles away.
Status
Not reporting
Checking status…
Connectors
Type 2 · 7 kW
Site information
- Operator
- evyve
- Opening hours
- Open 24 hours
- Payment
- In the evyve Charge appRFID card
- Charger ID
- Black Swan 01-A
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Prices
| Connector | Power | Price |
|---|---|---|
| Type 2 | 7 kW | 65p per kWh |
Price at the charger, including VAT. Paying in the operator's app may cost less.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Black Swan (Henley-In-Arden) (evyve)?
The listed price is £0.65/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Black Swan (Henley-In-Arden) (evyve)?
Up to 7 kW AC via Type 2.
How many charging sockets does Black Swan (Henley-In-Arden) (evyve) have?
1 charging socket: 1 × 7 kW Type 2. Live per-socket availability is shown on this page.
Is Black Swan (Henley-In-Arden) (evyve) open 24/7?
Yes - Black Swan (Henley-In-Arden) (evyve) is open 24 hours a day, 7 days a week.
When is Black Swan (Henley-In-Arden) (evyve) busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 6 pm and quietest around 6 am. The live status on this page shows what is free before you set off.
Who operates Black Swan (Henley-In-Arden)?
Black Swan (Henley-In-Arden) is on the evyve network.
Where is the nearest charger with 50 kW or more to Black Swan (Henley-In-Arden) (evyve)?
The Bull's Head, Wootton Wawen (Osprey Charging) is 2 miles away in a straight line, with up to 75 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Black Swan (Henley-In-Arden) (evyve)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Black Swan (Henley-In-Arden) (evyve)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh (~£26 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Black Swan (Henley-In-Arden) (evyve)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh (~£33 at the published price). Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Fastest nearby
- The Bull's Head, Wootton Wawen · 75 kW · 2 mi