Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

evyve · EV charging site

Poppy Field Farm (Duston)

Telstar Way 1, Northampton, NN5 6GT

Poppy Field Farm (Duston) is an EV charging site in Northampton, West Northamptonshire, run by evyve and open 24 hours a day. All 4 of its sockets are 75 kW CCS, and the published price is £0.85 per kWh. Recorded live status shows it is usually busiest around 4 pm, and Amp Map measured 100% uptime and recorded 409 charging sessions here over the last 30 days. 3 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Upton Way SF Connect (BP Pulse), 0.7 miles away.

Status

3 of 4 available

Checking status…

VerifiedLive status and details from evyve’s data feed. Amp Map updates them automatically.Last synced 22 Nov 2026

Connectors

CCS · 75 kW4 connectors · 85p per kWh3 free1 in use
Poppy Field 01-A100% reliabilityAvailable
Poppy Field 01-B100% reliabilityAvailable
Poppy Field 02-A100% reliabilityAvailable
Poppy Field 02-B100% reliabilityCharging

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
evyve
Opening hours
Open 24 hours
Payment
Bank card at the chargerIn the evyve Charge appRFID card
Charger ID
Poppy Field 01-A

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS75 kW85p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 75 kW CCS~47 min · ≈ 55 kWh · ~£47
Tesla Model 3 Rear-Wheel Drive 10–80% · 75 kW CCS~35 min · ≈ 40 kWh · ~£34
Audi Q4 e-tron 50 10–80% · 75 kW CCS~49 min · ≈ 51 kWh · ~£43
Hyundai IONIQ 5 10–80% · 75 kW CCS~43 min · ≈ 51 kWh · ~£43
MG Motor MG4 Trophy 10–80% · 75 kW CCS~40 min · ≈ 43 kWh · ~£36
Hyundai Kona Electric Long Range 10–80% · 75 kW CCS~43 min · ≈ 41 kWh · ~£35

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Poppy Field Farm (Duston) (evyve)?

The listed price is £0.85/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Poppy Field Farm (Duston) (evyve)?

Up to 75 kW DC via CCS.

How many charging sockets does Poppy Field Farm (Duston) (evyve) have?

4 charging sockets: 4 × 75 kW CCS. Live per-socket availability is shown on this page.

Is Poppy Field Farm (Duston) (evyve) open 24/7?

Yes - Poppy Field Farm (Duston) (evyve) is open 24 hours a day, 7 days a week.

When is Poppy Field Farm (Duston) (evyve) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 4 pm and quietest around 6 am. The live status on this page shows what is free before you set off.

How reliable is Poppy Field Farm (Duston) (evyve)?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 409 observed charging sessions.

Who operates Poppy Field Farm (Duston)?

Poppy Field Farm (Duston) is on the evyve network.

Where is the nearest other charger with 50 kW or more to Poppy Field Farm (Duston) (evyve)?

Upton Way SF Connect (BP Pulse) is 0.7 miles away in a straight line, with up to 150 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Poppy Field Farm (Duston) (evyve)?

A typical 10–80% rapid charge takes about 47 min on the 75 kW CCS here, adding roughly 55 kWh (~£47 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Poppy Field Farm (Duston) (evyve)?

A typical 10–80% rapid charge takes about 35 min on the 75 kW CCS here, adding roughly 40 kWh (~£34 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Poppy Field Farm (Duston) (evyve)?

A typical 10–80% rapid charge takes about 49 min on the 75 kW CCS here, adding roughly 51 kWh (~£43 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: evyve · synced 22 Nov 2026

Amp Map does not take payment. You pay the operator.