Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

evyve · EV charging site

Railway (Meols)

143-145 Birkenhead Rd, Moreton, CH47 6AB

Railway (Meols) is an EV charging site in Moreton, Metropolitan Borough of Wirral, run by evyve and open 24 hours a day. All 4 of its sockets are 75 kW CCS, and the published price is £0.85 per kWh. Recorded live status shows it is usually busiest around noon, and Amp Map measured 100% uptime and recorded 309 charging sessions here over the last 30 days. 7 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is GECS - Green Energy Charging Station, 1.8 miles away.

Status

3 of 4 available

Checking status…

VerifiedLive status and details from evyve’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

CCS · 75 kW4 connectors · 85p per kWh3 free1 in use
Railway 01-A100% reliabilityAvailable
Railway 01-B100% reliabilityAvailable
Railway 02-A100% reliabilityCharging
Railway 02-B100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
evyve
Opening hours
Open 24 hours
Payment
Bank card at the chargerIn the evyve Charge appRFID card
Charger ID
Railway 01-A

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS75 kW85p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 75 kW CCS~47 min · ≈ 55 kWh · ~£47
Tesla Model 3 Rear-Wheel Drive 10–80% · 75 kW CCS~35 min · ≈ 40 kWh · ~£34
Audi Q4 e-tron 50 10–80% · 75 kW CCS~49 min · ≈ 51 kWh · ~£43
Hyundai IONIQ 5 10–80% · 75 kW CCS~43 min · ≈ 51 kWh · ~£43
MG Motor MG4 Trophy 10–80% · 75 kW CCS~40 min · ≈ 43 kWh · ~£36
Hyundai Kona Electric Long Range 10–80% · 75 kW CCS~43 min · ≈ 41 kWh · ~£35

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Railway (Meols) (evyve)?

The listed price is £0.85/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Railway (Meols) (evyve)?

Up to 75 kW DC via CCS.

How many charging sockets does Railway (Meols) (evyve) have?

4 charging sockets: 4 × 75 kW CCS. Live per-socket availability is shown on this page.

Is Railway (Meols) (evyve) open 24/7?

Yes - Railway (Meols) (evyve) is open 24 hours a day, 7 days a week.

When is Railway (Meols) (evyve) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is Railway (Meols) (evyve)?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 309 observed charging sessions.

Who operates Railway (Meols)?

Railway (Meols) is on the evyve network.

Where is the nearest other charger with 50 kW or more to Railway (Meols) (evyve)?

GECS - Green Energy Charging Station is 1.8 miles away in a straight line, with up to 300 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Railway (Meols) (evyve)?

A typical 10–80% rapid charge takes about 47 min on the 75 kW CCS here, adding roughly 55 kWh (~£47 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Railway (Meols) (evyve)?

A typical 10–80% rapid charge takes about 35 min on the 75 kW CCS here, adding roughly 40 kWh (~£34 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Railway (Meols) (evyve)?

A typical 10–80% rapid charge takes about 49 min on the 75 kW CCS here, adding roughly 51 kWh (~£43 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: evyve · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.