EZ-Charge · EV charging site
New Street Carpark
New Street, Witney
New Street Carpark is an EV charging site in Witney, Oxfordshire, run by EZ-Charge. It has a single socket, with Type 2 at up to 22 kW, and the price is listed as £0.45/KWh. 1 other charging site is listed within a mile, and the nearest site with 50 kW or more is Shell Recharge Shell Holywell, 1.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- EZ-Charge
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- £0.45/KWh(from Open Charge Map, 1 Oct 2022)
- Phone (from Open Charge Map)
- +44 1869 322500
- Notes
- Council car park
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at New Street Carpark (EZ-Charge)?
The listed price is £0.45/KWh. Prices can change, so check the price at the charger before you start.
How fast is charging at New Street Carpark (EZ-Charge)?
Up to 22 kW AC via Type 2.
How many charging sockets does New Street Carpark (EZ-Charge) have?
1 charging socket: 2 × 22 kW Type 2, 2 × 22 kW Type 2, 2 × 22 kW Type 2, 2 × 22 kW Type 2, 2 × 22 kW Type 2, 2 × 22 kW Type 2.
Who operates New Street Carpark?
New Street Carpark is on the EZ-Charge network. For site issues, the operator lists +44 1869 322500.
Where is the nearest charger with 50 kW or more to New Street Carpark (EZ-Charge)?
Shell Recharge Shell Holywell is 1.2 miles away in a straight line, with up to 180 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at New Street Carpark (EZ-Charge)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at New Street Carpark (EZ-Charge)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at New Street Carpark (EZ-Charge)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Pod Point 30 Chipping Norton Limited
- Shell Recharge Shell Holywell
- Pod Point Stone Farm Holiday Cottages
- Pod Point Bourne Leisure - Heythorp Hotel
- Cheapest nearby
- Pod Point Bourne Leisure - Heythorp Hotel · Free · 7 kW · 3.2 mi
- Fastest nearby
- Shell Recharge Shell Holywell · 180 kW · 1.2 mi