# New Street Carpark · EZ-Charge

Web page: https://ampmap.co.uk/charger/ez-charge-new-street-carpark-uk

New Street Carpark is an EV charging site in Witney, Oxfordshire, run by EZ-Charge. It has a single socket, with Type 2 at up to 22 kW, and the price is listed as £0.45/KWh.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** New Street
- **Area:** Witney, Oxfordshire, United Kingdom
- **Coordinates (latitude, longitude):** 51.94059, -1.54761

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 22 kW | 12 | Not listed |

- **Price:** £0.45/KWh (from Open Charge Map)

## Site information

- **Operator:** EZ-Charge
- **Opening hours:** Not published
- **Access:** Public
- **Payment:** Pay at the charger (from Open Charge Map)
- **Notes:** Council car park

## Common questions

### How much does it cost to charge at New Street Carpark (EZ-Charge)?

The listed price is £0.45/KWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at New Street Carpark (EZ-Charge)?

Up to 22 kW AC via Type 2.

### How many charging sockets does New Street Carpark (EZ-Charge) have?

1 charging socket: 2 × 22 kW Type 2, 2 × 22 kW Type 2, 2 × 22 kW Type 2, 2 × 22 kW Type 2, 2 × 22 kW Type 2, 2 × 22 kW Type 2.

### Who operates New Street Carpark?

New Street Carpark is on the EZ-Charge network. For site issues, the operator lists +44 1869 322500.

### How long does a Tesla Model Y Long Range take to charge at New Street Carpark (EZ-Charge)?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at New Street Carpark (EZ-Charge)?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at New Street Carpark (EZ-Charge)?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Witney](https://ampmap.co.uk/chargers/united-kingdom/oxfordshire/witney)
- [EZ-Charge chargers](https://ampmap.co.uk/networks/ez-charge)

## Chargers near this site

- [Pod Point 30 Chipping Norton Limited](https://ampmap.co.uk/charger/pod-point-30-chipping-norton-limited-uk) - Type 2 7 kW · 1-8 Harpers Yard, Portland Place · From 50.4p/kWh
- [Shell Recharge Shell Holywell](https://ampmap.co.uk/charger/shell-recharge-shell-holywell-uk) - CCS / CHAdeMO 180 kW · Chapel Cross Roads · From 89p/kWh
- [Pod Point Stone Farm Holiday Cottages](https://ampmap.co.uk/charger/pod-point-stone-farm-holiday-cottages-uk) - Type 2 7 kW · Stone Farm, Lidstone · From 34.8p/kWh
- [Pod Point Bourne Leisure - Heythorp Hotel](https://ampmap.co.uk/charger/pod-point-bourne-leisure-heythorp-hotel-uk) - Type 2 7 kW · Heythorp Hotel Warner - Heythrop Park · Free to use

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/ez-charge-new-street-carpark-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 1 Oct 2022).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
