EZ-Charge · EV charging site
Wantage - Portway Car Park
Wantage Civic Hall, Didcot, OX12 8DA
Wantage - Portway Car Park is an EV charging site in Didcot, Oxfordshire, run by EZ-Charge. All 12 of its sockets are 22 kW Type 2. 1 other charging site is listed within a mile, and the nearest site with 50 kW or more is McDonald's Didcot (InstaVolt Ltd), 5.9 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- EZ-Charge
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- £0.35/kWh. Parking Fees Apply during daytime.(from Open Charge Map, 17 Jun 2022)
- Phone (from Open Charge Map)
- +44 1869 322500
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Wantage - Portway Car Park (EZ-Charge)?
The listed price is £0.35/kWh. Parking Fees Apply during daytime.. Prices can change, so check the price at the charger before you start.
How fast is charging at Wantage - Portway Car Park (EZ-Charge)?
Up to 22 kW AC via Type 2.
How many charging sockets does Wantage - Portway Car Park (EZ-Charge) have?
12 charging sockets: 2 × 22 kW Type 2, 2 × 22 kW Type 2, 2 × 22 kW Type 2, 2 × 22 kW Type 2, 2 × 22 kW Type 2, 2 × 22 kW Type 2.
Who operates Wantage - Portway Car Park?
Wantage - Portway Car Park is on the EZ-Charge network. For site issues, the operator lists +44 1869 322500.
Where is the nearest charger with 50 kW or more to Wantage - Portway Car Park (EZ-Charge)?
McDonald's Didcot (InstaVolt Ltd) is 5.9 miles away in a straight line, with up to 120 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Wantage - Portway Car Park (EZ-Charge)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Wantage - Portway Car Park (EZ-Charge)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Wantage - Portway Car Park (EZ-Charge)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.