# Ards Blair Mayne Wellbeing & Leisure Complex · EZO (IE)

Web page: https://ampmap.co.uk/charger/ezo-ards-blair-mayne-wellbeing-and-leisure-complex-uk

Ards Blair Mayne Wellbeing & Leisure Complex is an EV charging site in Newtownards, Ards and North Down, run by EZO (IE). Its 4 sockets reach up to 75 kW, with CCS and CHAdeMO at the top speed.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Dairy Hall Lane, BT23 4QA
- **Area:** Newtownards, Ards and North Down, United Kingdom
- **Coordinates (latitude, longitude):** 54.59086, -5.69972

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 75 kW | 1 | Not listed |
| CHAdeMO | 75 kW | 1 | Not listed |
| CCS | 50 kW | 2 | Not listed |

## Site information

- **Operator:** EZO (IE)
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How fast is charging at Ards Blair Mayne Wellbeing & Leisure Complex (EZO (IE))?

Up to 75 kW DC via CCS, CHAdeMO.

### How many charging sockets does Ards Blair Mayne Wellbeing & Leisure Complex (EZO (IE)) have?

4 charging sockets: 2 × 50 kW CCS, 1 × 75 kW CCS, 1 × 75 kW CHAdeMO.

### Who operates Ards Blair Mayne Wellbeing & Leisure Complex?

Ards Blair Mayne Wellbeing & Leisure Complex is on the EZO (IE) network.

### How long does a Tesla Model Y Long Range take to charge at Ards Blair Mayne Wellbeing & Leisure Complex (EZO (IE))?

A typical 10–80% rapid charge takes about 47 min on the 75 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Ards Blair Mayne Wellbeing & Leisure Complex (EZO (IE))?

A typical 10–80% rapid charge takes about 35 min on the 75 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Ards Blair Mayne Wellbeing & Leisure Complex (EZO (IE))?

A typical 10–80% rapid charge takes about 49 min on the 75 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Newtownards](https://ampmap.co.uk/chargers/united-kingdom/ards-and-north-down/newtownards)
- [EZO (IE) chargers](https://ampmap.co.uk/networks/ezo-ie)

## Chargers near this site

- [Ards Hospital · Weev](https://ampmap.co.uk/charger/weev-ards-hospital-2-uk) - Type 2 22 kW · 24- 32 Frederick Street
- [Ards Hospital · Weev](https://ampmap.co.uk/charger/weev-ards-hospital-uk) - Type 2 22 kW · 24 - 32 Frederick Street
- [West Street Car Park · Weev](https://ampmap.co.uk/charger/weev-west-street-car-park-uk) - Type 2 22 kW · West St
- [Ann Street Car Park · Weev](https://ampmap.co.uk/charger/weev-ann-street-car-park-uk) - Type 2 22 kW · Ann St
- [Lidl · EZO (IE)](https://ampmap.co.uk/charger/ezo-lidl-8-uk) - Type 2 22 kW · Castlebawn Roundabout
- [HRL Rosevale · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-bp-rosevale-uk) - CCS 150 kW · Newtownards

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/ezo-ards-blair-mayne-wellbeing-and-leisure-complex-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 19 Aug 2026).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
