EZO (IE) · EV charging site
Ballymote Sports & Wellbeing Centre
96 Glebetown Drive, Downpatrick, BT30 6PY
Ballymote Sports & Wellbeing Centre is an EV charging site in Downpatrick, Newry Mourne and Down, run by EZO (IE). It has a single socket, with CHAdeMO and CCS at up to 50 kW. 7 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is HRL Ardglass Road (BP Pulse), 0.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- EZO (IE)
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Ballymote Sports & Wellbeing Centre (EZO (IE))?
Up to 50 kW DC via CHAdeMO, CCS.
How many charging sockets does Ballymote Sports & Wellbeing Centre (EZO (IE)) have?
1 charging socket: 1 × 50 kW CHAdeMO, 1 × 50 kW CCS.
Who operates Ballymote Sports & Wellbeing Centre?
Ballymote Sports & Wellbeing Centre is on the EZO (IE) network.
Where is the nearest other charger with 50 kW or more to Ballymote Sports & Wellbeing Centre (EZO (IE))?
HRL Ardglass Road (BP Pulse) is 0.5 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Ballymote Sports & Wellbeing Centre (EZO (IE))?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Ballymote Sports & Wellbeing Centre (EZO (IE))?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Ballymote Sports & Wellbeing Centre (EZO (IE))?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- HRL Ardglass Road
- Down Leisure Centre
- Ratkeltair House
- Downshire Civic Centre
- Downshire Hospital (Staff Car Park 1)
- Downshire Hospital (Staff Car Park 2)
- Fastest nearby
- Down Leisure Centre · 180 kW · 0.6 mi