EZO (IE) · EV charging site
Bangor Aurora Aquatic & Leisure Complex
Valentine Road, Bangor, BT20 4TB
Bangor Aurora Aquatic & Leisure Complex is an EV charging site in Bangor, Ards and North Down, run by EZO (IE). Its 8 sockets reach up to 75 kW, with CHAdeMO at the top speed. 10 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Bloomfield Shopping Centre & Retail Park (ESB Ecars), 0.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- EZO (IE)
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Bangor Aurora Aquatic & Leisure Complex (EZO (IE))?
Up to 75 kW DC via CHAdeMO, CCS.
How many charging sockets does Bangor Aurora Aquatic & Leisure Complex (EZO (IE)) have?
8 charging sockets: 1 × 75 kW CHAdeMO, 3 × 75 kW CHAdeMO, 4 × 50 kW CCS.
Who operates Bangor Aurora Aquatic & Leisure Complex?
Bangor Aurora Aquatic & Leisure Complex is on the EZO (IE) network.
Where is the nearest other charger with 50 kW or more to Bangor Aurora Aquatic & Leisure Complex (EZO (IE))?
Bloomfield Shopping Centre & Retail Park (ESB Ecars) is 0.4 miles away in a straight line, with up to 200 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Bangor Aurora Aquatic & Leisure Complex (EZO (IE))?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Bangor Aurora Aquatic & Leisure Complex (EZO (IE))?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Bangor Aurora Aquatic & Leisure Complex (EZO (IE))?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Aurora Car Park Bangor
- Bloomfield Shopping Centre & Retail Park
- McDonald's
- Bloomfields Shopping Centre
- Bingham Lane
- Sammy Mellon & Sons-Hyundai
- Fastest nearby
- Bloomfield Shopping Centre & Retail Park · 200 kW · 0.4 mi