Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

EZO (IE) · EV charging site

Bangor Aurora Aquatic & Leisure Complex

Valentine Road, Bangor, BT20 4TB

Bangor Aurora Aquatic & Leisure Complex is an EV charging site in Bangor, Ards and North Down, run by EZO (IE). Its 8 sockets reach up to 75 kW, with CHAdeMO at the top speed. 10 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Bloomfield Shopping Centre & Retail Park (ESB Ecars), 0.4 miles away.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 19 Aug 2026Last verified 19 Aug 2026

Connectors

CHAdeMO · 75 kW4 connectors
CCS · 50 kW4 connectors

Site information

Operator
EZO (IE)
Opening hours
Not published
Access
Public · membership required · access key required

Facilities

Leisure

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 50 kW CCS~70 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 50 kW CCS~50 min
Audi Q4 e-tron 50 10–80% · 50 kW CCS~66 min
Hyundai IONIQ 5 10–80% · 50 kW CCS~64 min
MG Motor MG4 Trophy 10–80% · 50 kW CCS~55 min
Hyundai Kona Electric Long Range 10–80% · 50 kW CCS~55 min
Nissan LEAF 10–80% · 75 kW CHAdeMO~54 min

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How fast is charging at Bangor Aurora Aquatic & Leisure Complex (EZO (IE))?

Up to 75 kW DC via CHAdeMO, CCS.

How many charging sockets does Bangor Aurora Aquatic & Leisure Complex (EZO (IE)) have?

8 charging sockets: 1 × 75 kW CHAdeMO, 3 × 75 kW CHAdeMO, 4 × 50 kW CCS.

Who operates Bangor Aurora Aquatic & Leisure Complex?

Bangor Aurora Aquatic & Leisure Complex is on the EZO (IE) network.

Where is the nearest other charger with 50 kW or more to Bangor Aurora Aquatic & Leisure Complex (EZO (IE))?

Bloomfield Shopping Centre & Retail Park (ESB Ecars) is 0.4 miles away in a straight line, with up to 200 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Bangor Aurora Aquatic & Leisure Complex (EZO (IE))?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Bangor Aurora Aquatic & Leisure Complex (EZO (IE))?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Bangor Aurora Aquatic & Leisure Complex (EZO (IE))?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 19 Aug 2026