EZO (IE) · EV charging site
Construction Employers Federation (CEF)
143 Malone Road, Belfast, BT9 6SX
Construction Employers Federation (CEF) is an EV charging site in Belfast, City of Belfast, run by EZO (IE). It has a single 22 kW Type 2 socket. 7 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Hurst Nissan Centre Belfast (Nissan UK Dealer Network), 0.8 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- EZO (IE)
- Opening hours
- Not published
- Access
- Customers only
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Construction Employers Federation (CEF) (EZO (IE))?
Up to 22 kW AC via Type 2.
How many charging sockets does Construction Employers Federation (CEF) (EZO (IE)) have?
1 charging socket: 1 × 22 kW Type 2.
Who operates Construction Employers Federation (CEF)?
Construction Employers Federation (CEF) is on the EZO (IE) network.
Can anyone charge at Construction Employers Federation (CEF) (EZO (IE))?
The operator lists this charger for customers of the site.
Where is the nearest charger with 50 kW or more to Construction Employers Federation (CEF) (EZO (IE))?
Hurst Nissan Centre Belfast (Nissan UK Dealer Network) is 0.8 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Construction Employers Federation (CEF) (EZO (IE))?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Construction Employers Federation (CEF) (EZO (IE))?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Construction Employers Federation (CEF) (EZO (IE))?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Pod Point Ulster Independent Clinic
- Maven
- Hurst Nissan Centre Belfast
- Charles Hurst Renault
- Shane Retail Park
- Cordia Apartments
- Cheapest nearby
- Pod Point Ulster Independent Clinic · 50.4p per kWh · 22 kW · 0.4 mi
- Fastest nearby
- Hurst Nissan Centre Belfast · 50 kW · 0.8 mi