Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

EZO (IE) · EV charging site

George Canning Spar Bellarena

436 Seacoast Rd, Coleraine, BT49 0LD

George Canning Spar Bellarena is an EV charging site in Coleraine, Causeway Coast and Glens, run by EZO (IE). Both of its sockets are 47 kW CCS. No other charging site is listed within a mile, and the nearest site with 50 kW or more is Lidl, 10.7 miles away.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 15 Sept 2025Last verified 15 Sept 2025

Connectors

CCS · 47 kW2 connectors

Site information

Operator
EZO (IE)
Opening hours
Not published
Access
Public · membership required · access key required

Facilities

SupermarketSpar

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 47 kW CCS~74 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 47 kW CCS~54 min
Audi Q4 e-tron 50 10–80% · 47 kW CCS~70 min
Hyundai IONIQ 5 10–80% · 47 kW CCS~68 min
MG Motor MG4 Trophy 10–80% · 47 kW CCS~58 min
Hyundai Kona Electric Long Range 10–80% · 47 kW CCS~58 min

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How fast is charging at George Canning Spar Bellarena (EZO (IE))?

Up to 47 kW DC via CCS.

How many charging sockets does George Canning Spar Bellarena (EZO (IE)) have?

2 charging sockets: 2 × 47 kW CCS.

Who operates George Canning Spar Bellarena?

George Canning Spar Bellarena is on the EZO (IE) network.

Where is the nearest charger with 50 kW or more to George Canning Spar Bellarena (EZO (IE))?

Lidl is 10.7 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at George Canning Spar Bellarena (EZO (IE))?

A typical 10–80% rapid charge takes about 74 min on the 47 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at George Canning Spar Bellarena (EZO (IE))?

A typical 10–80% rapid charge takes about 54 min on the 47 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at George Canning Spar Bellarena (EZO (IE))?

A typical 10–80% rapid charge takes about 70 min on the 47 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 15 Sept 2025