EZO (IE) · EV charging site
Lidl Omagh
James Street, Omagh, BT78 1QX
Lidl Omagh is an EV charging site in Omagh, Fermanagh and Omagh, run by EZO (IE). Both of its sockets are 50 kW CCS and CHAdeMO. 5 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Mellon Country Inn (Weev), 5.7 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- EZO (IE)
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Lidl Omagh (EZO (IE))?
Up to 50 kW DC via CCS, CHAdeMO.
How many charging sockets does Lidl Omagh (EZO (IE)) have?
2 charging sockets: 1 × 50 kW CCS, 1 × 50 kW CHAdeMO.
Who operates Lidl Omagh?
Lidl Omagh is on the EZO (IE) network.
Where is the nearest other charger with 50 kW or more to Lidl Omagh (EZO (IE))?
Mellon Country Inn (Weev) is 5.7 miles away in a straight line, with up to 60 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Lidl Omagh (EZO (IE))?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Lidl Omagh (EZO (IE))?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Lidl Omagh (EZO (IE))?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.