Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

FOR EV · EV charging site

Highhouse Industrial Estate - 0078

Barony Road, Auchinleck, KA18 2LL

Highhouse Industrial Estate - 0078 is an EV charging site in Auchinleck, East Ayrshire, run by FOR EV and open 24 hours a day. Its 4 sockets reach up to 160 kW, with CCS at the top speed, and the published price is £0.69 per kWh. Recorded live status shows it is usually busiest around noon, and Amp Map measured 100% uptime here over the last 30 days. 3 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Tanyard Car Park, Cumnock (Chargeplace Scotland), 1.4 miles away.

Status

4 of 4 available

Checking status…

VerifiedLive status and details from FOR EV’s data feed. Amp Map updates them automatically.Last synced 22 Nov 2026

Connectors

CCS · 160 kW1 connector · 69p per kWh1 free
HIGHHOUSE-2-CCS100% reliabilityAvailable
CCS · 150 kW2 connectors · 69p per kWh2 free
HIGHHOUSE-1-CCS100% reliabilityAvailable
HIGHHOUSE-4-CCS100% reliabilityAvailable
CHAdeMO · 150 kW1 connector · 69p per kWh1 free
HIGHHOUSE-3-CHA100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
FOR EV
Opening hours
Open 24 hours
Parking
Car park
Payment
Contactless card at the chargerIn the FOR EV appRFID card
Charger ID
HIGHHOUSE-1-CCS

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS160 kW69p per kWh
CCS150 kW69p per kWh
CHAdeMO150 kW69p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 160 kW CCS~26 min · ≈ 55 kWh · ~£38
Tesla Model 3 Rear-Wheel Drive 10–80% · 160 kW CCS~23 min · ≈ 40 kWh · ~£28
Audi Q4 e-tron 50 10–80% · 160 kW CCS~39 min · ≈ 51 kWh · ~£35
Hyundai IONIQ 5 10–80% · 160 kW CCS~22 min · ≈ 51 kWh · ~£35
MG Motor MG4 Trophy 10–80% · 160 kW CCS~30 min · ≈ 43 kWh · ~£29
Hyundai Kona Electric Long Range 10–80% · 160 kW CCS~39 min · ≈ 41 kWh · ~£28
Nissan LEAF 10–80% · 150 kW CHAdeMO~54 min · ≈ 28 kWh · ~£19

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Highhouse Industrial Estate - 0078 (FOR EV)?

The listed price is £0.69/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Highhouse Industrial Estate - 0078 (FOR EV)?

Up to 160 kW DC via CCS, CHAdeMO.

How many charging sockets does Highhouse Industrial Estate - 0078 (FOR EV) have?

4 charging sockets: 2 × 150 kW CCS, 1 × 150 kW CHAdeMO, 1 × 160 kW CCS. Live per-socket availability is shown on this page.

Is Highhouse Industrial Estate - 0078 (FOR EV) open 24/7?

Yes - Highhouse Industrial Estate - 0078 (FOR EV) is open 24 hours a day, 7 days a week.

When is Highhouse Industrial Estate - 0078 (FOR EV) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 6 am. The live status on this page shows what is free before you set off.

How reliable is Highhouse Industrial Estate - 0078 (FOR EV)?

Amp Map measured 100% uptime here from recorded live status over the last 30 days.

Who operates Highhouse Industrial Estate - 0078?

Highhouse Industrial Estate - 0078 is on the FOR EV network.

Where is the nearest other charger with 50 kW or more to Highhouse Industrial Estate - 0078 (FOR EV)?

Tanyard Car Park, Cumnock (Chargeplace Scotland) is 1.4 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Highhouse Industrial Estate - 0078 (FOR EV)?

A typical 10–80% rapid charge takes about 26 min on the 160 kW CCS here, adding roughly 55 kWh (~£38 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Highhouse Industrial Estate - 0078 (FOR EV)?

A typical 10–80% rapid charge takes about 23 min on the 160 kW CCS here, adding roughly 40 kWh (~£28 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Highhouse Industrial Estate - 0078 (FOR EV)?

A typical 10–80% rapid charge takes about 39 min on the 160 kW CCS here, adding roughly 51 kWh (~£35 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: FOR EV · synced 22 Nov 2026

Amp Map does not take payment. You pay the operator.