Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

FOR EV · EV charging site

Port Edgar Marina - 0110

Port Edgar Marina, Broxburn, EH30 9SQ

Port Edgar Marina - 0110 is an EV charging site in Broxburn, West Lothian, run by FOR EV and open 24 hours a day. Its 3 sockets reach up to 50 kW, with CHAdeMO and CCS at the top speed, and the published price is £0.75 per kWh. Recorded live status shows it is usually busiest around noon, and Amp Map measured 98% uptime and recorded 52 charging sessions here over the last 30 days. 5 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Forth Bridge Visitors Centre (Chargeplace Scotland), 0.3 miles away.

Status

3 of 3 available

Checking status…

VerifiedLive status and details from FOR EV’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

CCS · 50 kW1 connector · 75p per kWh1 free
PORTEDGAR-1-CCS100% reliabilityAvailable
CHAdeMO · 50 kW1 connector · 75p per kWh1 free
PORTEDGAR-2-CHA95% reliabilityAvailable
Type 2 · 22 kW1 connector · 75p per kWh1 free
PORTEDGAR-3-AC100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
FOR EV
Opening hours
Open 24 hours
Parking
Car park
Payment
Contactless card at the chargerIn the FOR EV appRFID card
Charger ID
PORTEDGAR-3-AC

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CHAdeMO50 kW75p per kWh
CCS50 kW75p per kWh
Type 222 kW75p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 50 kW CCS~70 min · ≈ 55 kWh · ~£41
Tesla Model 3 Rear-Wheel Drive 10–80% · 50 kW CCS~50 min · ≈ 40 kWh · ~£30
Audi Q4 e-tron 50 10–80% · 50 kW CCS~66 min · ≈ 51 kWh · ~£38
Hyundai IONIQ 5 10–80% · 50 kW CCS~64 min · ≈ 51 kWh · ~£38
MG Motor MG4 Trophy 10–80% · 50 kW CCS~55 min · ≈ 43 kWh · ~£32
Hyundai Kona Electric Long Range 10–80% · 50 kW CCS~55 min · ≈ 41 kWh · ~£30
Nissan LEAF 10–80% · 50 kW CHAdeMO~55 min · ≈ 28 kWh · ~£21

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Port Edgar Marina - 0110 (FOR EV)?

The listed price is £0.75/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Port Edgar Marina - 0110 (FOR EV)?

Up to 50 kW DC via CHAdeMO, CCS, Type 2.

How many charging sockets does Port Edgar Marina - 0110 (FOR EV) have?

3 charging sockets: 1 × 50 kW CHAdeMO, 1 × 50 kW CCS, 1 × 22 kW Type 2. Live per-socket availability is shown on this page.

Is Port Edgar Marina - 0110 (FOR EV) open 24/7?

Yes - Port Edgar Marina - 0110 (FOR EV) is open 24 hours a day, 7 days a week.

When is Port Edgar Marina - 0110 (FOR EV) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 6 am. The live status on this page shows what is free before you set off.

How reliable is Port Edgar Marina - 0110 (FOR EV)?

Amp Map measured 98% uptime here from recorded live status over the last 30 days, across 52 observed charging sessions.

Who operates Port Edgar Marina - 0110?

Port Edgar Marina - 0110 is on the FOR EV network.

Where is the nearest other charger with 50 kW or more to Port Edgar Marina - 0110 (FOR EV)?

Forth Bridge Visitors Centre (Chargeplace Scotland) is 0.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Port Edgar Marina - 0110 (FOR EV)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh (~£41 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Port Edgar Marina - 0110 (FOR EV)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh (~£30 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Port Edgar Marina - 0110 (FOR EV)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh (~£38 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: FOR EV · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.