Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

FOR EV · EV charging site

Ullapool Ferry Terminal - 0278

West Shore Road, Ullapool, IV26 2UH

Ullapool Ferry Terminal - 0278 is an EV charging site in Ullapool, Highland, run by FOR EV and open 24 hours a day. Both of its sockets are 100 kW CCS, and the published price is £0.70 per kWh. Recorded live status shows it is usually busiest around 4 pm, and Amp Map measured 100% uptime and recorded 101 charging sessions here over the last 30 days. 4 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Ullapool Harbour (Chargeplace Scotland), 150 yards away.

Status

2 of 2 available

Checking status…

VerifiedLive status and details from FOR EV’s data feed. Amp Map updates them automatically.Last synced 20 Nov 2026

Connectors

CCS · 100 kW2 connectors · 70p per kWh2 free
ULLAPOOL-1-CCS100% reliabilityAvailable
ULLAPOOL-2-CCS100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
FOR EV
Opening hours
Open 24 hours
Parking
Car park
Payment
Contactless card at the chargerIn the FOR EV appRFID card
Charger ID
ULLAPOOL-1-CCS

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS100 kW70p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 100 kW CCS~36 min · ≈ 55 kWh · ~£39
Tesla Model 3 Rear-Wheel Drive 10–80% · 100 kW CCS~29 min · ≈ 40 kWh · ~£28
Audi Q4 e-tron 50 10–80% · 100 kW CCS~43 min · ≈ 51 kWh · ~£36
Hyundai IONIQ 5 10–80% · 100 kW CCS~32 min · ≈ 51 kWh · ~£36
MG Motor MG4 Trophy 10–80% · 100 kW CCS~34 min · ≈ 43 kWh · ~£30
Hyundai Kona Electric Long Range 10–80% · 100 kW CCS~40 min · ≈ 41 kWh · ~£28

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Ullapool Ferry Terminal - 0278 (FOR EV)?

The listed price is £0.70/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Ullapool Ferry Terminal - 0278 (FOR EV)?

Up to 100 kW DC via CCS.

How many charging sockets does Ullapool Ferry Terminal - 0278 (FOR EV) have?

2 charging sockets: 2 × 100 kW CCS. Live per-socket availability is shown on this page.

Is Ullapool Ferry Terminal - 0278 (FOR EV) open 24/7?

Yes - Ullapool Ferry Terminal - 0278 (FOR EV) is open 24 hours a day, 7 days a week.

When is Ullapool Ferry Terminal - 0278 (FOR EV) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 4 pm and quietest around 10 pm. The live status on this page shows what is free before you set off.

How reliable is Ullapool Ferry Terminal - 0278 (FOR EV)?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 101 observed charging sessions.

Who operates Ullapool Ferry Terminal - 0278?

Ullapool Ferry Terminal - 0278 is on the FOR EV network.

Where is the nearest other charger with 50 kW or more to Ullapool Ferry Terminal - 0278 (FOR EV)?

Ullapool Harbour (Chargeplace Scotland) is 150 yards away in a straight line, with up to 100 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Ullapool Ferry Terminal - 0278 (FOR EV)?

A typical 10–80% rapid charge takes about 36 min on the 100 kW CCS here, adding roughly 55 kWh (~£39 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Ullapool Ferry Terminal - 0278 (FOR EV)?

A typical 10–80% rapid charge takes about 29 min on the 100 kW CCS here, adding roughly 40 kWh (~£28 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Ullapool Ferry Terminal - 0278 (FOR EV)?

A typical 10–80% rapid charge takes about 43 min on the 100 kW CCS here, adding roughly 51 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: FOR EV · synced 20 Nov 2026

Amp Map does not take payment. You pay the operator.