FOR EV · EV charging site
Woodend Industrial Estate - Block 4, Unit 7 - 0275
Unit 7, Block 4, Ind. Estate, Woodend Place, Dunfermline, KY4 8HW
Woodend Industrial Estate - Block 4, Unit 7 - 0275 is an EV charging site in Dunfermline, Fife, run by FOR EV and open 24 hours a day. All 4 of its sockets are 100 kW CCS, and the published price is £0.69 per kWh. Recorded live status shows it is usually busiest around 1 pm, and Amp Map measured 100% uptime and recorded 200 charging sessions here over the last 30 days. 2 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Halbeath Park & Ride (Chargeplace Scotland), 1.6 miles away.
Status
4 of 4 available
Checking status…
Connectors
CCS · 100 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- FOR EV
- Opening hours
- Open 24 hours
- Parking
- Car park
- Payment
- Contactless card at the chargerIn the FOR EV appRFID card
- Charger ID
- BLOCK4-1-CCS
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Prices
| Connector | Power | Price |
|---|---|---|
| CCS | 100 kW | 69p per kWh |
Price at the charger, including VAT. Paying in the operator's app may cost less.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Woodend Industrial Estate - Block 4, Unit 7 - 0275 (FOR EV)?
The listed price is £0.69/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Woodend Industrial Estate - Block 4, Unit 7 - 0275 (FOR EV)?
Up to 100 kW DC via CCS.
How many charging sockets does Woodend Industrial Estate - Block 4, Unit 7 - 0275 (FOR EV) have?
4 charging sockets: 4 × 100 kW CCS. Live per-socket availability is shown on this page.
Is Woodend Industrial Estate - Block 4, Unit 7 - 0275 (FOR EV) open 24/7?
Yes - Woodend Industrial Estate - Block 4, Unit 7 - 0275 (FOR EV) is open 24 hours a day, 7 days a week.
When is Woodend Industrial Estate - Block 4, Unit 7 - 0275 (FOR EV) busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 1 pm and quietest around 11 pm. The live status on this page shows what is free before you set off.
How reliable is Woodend Industrial Estate - Block 4, Unit 7 - 0275 (FOR EV)?
Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 200 observed charging sessions.
Who operates Woodend Industrial Estate - Block 4, Unit 7 - 0275?
Woodend Industrial Estate - Block 4, Unit 7 - 0275 is on the FOR EV network.
Where is the nearest other charger with 50 kW or more to Woodend Industrial Estate - Block 4, Unit 7 - 0275 (FOR EV)?
Halbeath Park & Ride (Chargeplace Scotland) is 1.6 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Woodend Industrial Estate - Block 4, Unit 7 - 0275 (FOR EV)?
A typical 10–80% rapid charge takes about 36 min on the 100 kW CCS here, adding roughly 55 kWh (~£38 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Woodend Industrial Estate - Block 4, Unit 7 - 0275 (FOR EV)?
A typical 10–80% rapid charge takes about 29 min on the 100 kW CCS here, adding roughly 40 kWh (~£28 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Woodend Industrial Estate - Block 4, Unit 7 - 0275 (FOR EV)?
A typical 10–80% rapid charge takes about 43 min on the 100 kW CCS here, adding roughly 51 kWh (~£35 at the published price). Estimates assume a typical charge curve and a warm battery.