# Woodend Industrial Estate - Block 4, Unit 7 - 0275 · FOR EV

Web page: https://ampmap.co.uk/charger/for-ev-woodend-industrial-estate-block-4-unit-7-0275-uk

Woodend Industrial Estate - Block 4, Unit 7 - 0275 is an EV charging site in Dunfermline, Fife, run by FOR EV and open 24 hours a day. All 4 of its sockets are 100 kW CCS, and the published price is £0.69 per kWh. Recorded live status shows it is usually busiest around 1 pm, and Amp Map measured 100% uptime and recorded 196 charging sessions here over the last 30 days.

## Status

4 of 4 open at 23 Nov 2026, 01:27 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** Unit 7, Block 4, Ind. Estate, Woodend Place, KY4 8HW
- **Area:** Dunfermline, Fife, United Kingdom
- **Coordinates (latitude, longitude):** 56.09900, -3.35560
- **Parking:** Car park

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| CCS | 100 kW | 4 | £0.69/kWh | 4 free |

Price at the charger, including VAT. Paying in the operator's app may cost less.

## Site information

- **Operator:** FOR EV
- **Opening hours:** Open 24 hours
- **Payment:** Contactless card at the charger; In the FOR EV app; RFID card

## Common questions

### How much does it cost to charge at Woodend Industrial Estate - Block 4, Unit 7 - 0275 (FOR EV)?

The listed price is £0.69/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at Woodend Industrial Estate - Block 4, Unit 7 - 0275 (FOR EV)?

Up to 100 kW DC via CCS.

### How many charging sockets does Woodend Industrial Estate - Block 4, Unit 7 - 0275 (FOR EV) have?

4 charging sockets: 4 × 100 kW CCS. Live per-socket availability is shown on this page.

### Is Woodend Industrial Estate - Block 4, Unit 7 - 0275 (FOR EV) open 24/7?

Yes - Woodend Industrial Estate - Block 4, Unit 7 - 0275 (FOR EV) is open 24 hours a day, 7 days a week.

### When is Woodend Industrial Estate - Block 4, Unit 7 - 0275 (FOR EV) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 1 pm and quietest around 11 pm. The live status on this page shows what is free before you set off.

### How reliable is Woodend Industrial Estate - Block 4, Unit 7 - 0275 (FOR EV)?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 196 observed charging sessions.

### Who operates Woodend Industrial Estate - Block 4, Unit 7 - 0275?

Woodend Industrial Estate - Block 4, Unit 7 - 0275 is on the FOR EV network.

### How long does a Tesla Model Y Long Range take to charge at Woodend Industrial Estate - Block 4, Unit 7 - 0275 (FOR EV)?

A typical 10–80% rapid charge takes about 36 min on the 100 kW CCS here, adding roughly 55 kWh (~£38 at the published price). Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Woodend Industrial Estate - Block 4, Unit 7 - 0275 (FOR EV)?

A typical 10–80% rapid charge takes about 29 min on the 100 kW CCS here, adding roughly 40 kWh (~£28 at the published price). Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Woodend Industrial Estate - Block 4, Unit 7 - 0275 (FOR EV)?

A typical 10–80% rapid charge takes about 43 min on the 100 kW CCS here, adding roughly 51 kWh (~£35 at the published price). Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Dunfermline](https://ampmap.co.uk/chargers/united-kingdom/fife/dunfermline)
- [Cheapest charging in Dunfermline](https://ampmap.co.uk/chargers/united-kingdom/fife/dunfermline/cheapest)
- [FOR EV chargers](https://ampmap.co.uk/networks/for-ev)

## Chargers near this site

- [Cowdenbeath Leisure Centre · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-cowdenbeath-leisure-centre-uk) - Type 2 7 kW · 7 Pit Road
- [Cowdenbeath Leisure Centre · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-cowdenbeath-leisure-centre-2-uk) - Type 2 7 kW · Stenhouse Street
- [Halbeath Park & Ride · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-halbeath-park-and-ride-2-uk) - CCS 50 kW, CHAdeMO 50 kW · A92/M90 (Junction 3)
- [Fife Council Halbeath Depot · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-fife-council-halbeath-depot-uk) - CCS 50 kW, CHAdeMO 50 kW · Halbeath
- [Halbeath Park & Ride · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-halbeath-park-and-ride-3-uk) - Type 2 7 kW · Halbeath Park & Ride
- [Western Nissan · Nissan UK Dealer Network](https://ampmap.co.uk/charger/nissan-uk-dealer-network-western-nissan-2-uk) - CHAdeMO 50 kW · Halbeath Interchange

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/for-ev-woodend-industrial-estate-block-4-unit-7-0275-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: FOR EV (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.
