Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

FOR EV · EV charging site

Wright Business Centre - 0112

The Wright Business Centre, 1 Lonmay Rd, Rutherglen, G33 4EL

Wright Business Centre - 0112 is an EV charging site in Rutherglen, South Lanarkshire, run by FOR EV and open 24 hours a day. All 4 of its sockets are 22 kW Type 2, and the published price is £0.65 per kWh. Recorded live status shows it is usually busiest around noon, and Amp Map measured 100% uptime and recorded 44 charging sessions here over the last 30 days. 6 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Redcastle Square - 0202 (FOR EV), 0.4 miles away.

Status

4 of 4 available

Checking status…

VerifiedLive status and details from FOR EV’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

Type 2 · 22 kW4 connectors · 65p per kWh4 free
WRIGHT-1-AC100% reliabilityAvailable
WRIGHT-2-AC100% reliabilityAvailable
WRIGHT-3-AC100% reliabilityAvailable
WRIGHT-4-AC100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
FOR EV
Opening hours
Open 24 hours
Parking
Car park
Payment
Contactless card at the chargerIn the FOR EV appRFID card
Charger ID
WRIGHT-1-AC

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
Type 222 kW65p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 22 kW Type 2~5h 2m · ≈ 55 kWh · ~£36
Tesla Model 3 Rear-Wheel Drive 10–80% · 22 kW Type 2~3h 38m · ≈ 40 kWh · ~£26
Audi Q4 e-tron 50 10–80% · 22 kW Type 2~4h 39m · ≈ 51 kWh · ~£33
Hyundai IONIQ 5 10–80% · 22 kW Type 2~4h 37m · ≈ 51 kWh · ~£33
MG Motor MG4 Trophy 10–80% · 22 kW Type 2~3h 53m · ≈ 43 kWh · ~£28
Hyundai Kona Electric Long Range 10–80% · 22 kW Type 2~5h 38m · ≈ 41 kWh · ~£26
Nissan LEAF 10–80% · 22 kW Type 2~4h 15m · ≈ 28 kWh · ~£18

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Wright Business Centre - 0112 (FOR EV)?

The listed price is £0.65/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Wright Business Centre - 0112 (FOR EV)?

Up to 22 kW AC via Type 2.

How many charging sockets does Wright Business Centre - 0112 (FOR EV) have?

4 charging sockets: 4 × 22 kW Type 2. Live per-socket availability is shown on this page.

Is Wright Business Centre - 0112 (FOR EV) open 24/7?

Yes - Wright Business Centre - 0112 (FOR EV) is open 24 hours a day, 7 days a week.

When is Wright Business Centre - 0112 (FOR EV) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 9 pm. The live status on this page shows what is free before you set off.

How reliable is Wright Business Centre - 0112 (FOR EV)?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 44 observed charging sessions.

Who operates Wright Business Centre - 0112?

Wright Business Centre - 0112 is on the FOR EV network.

Where is the nearest charger with 50 kW or more to Wright Business Centre - 0112 (FOR EV)?

Redcastle Square - 0202 (FOR EV) is 0.4 miles away in a straight line, with up to 160 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Wright Business Centre - 0112 (FOR EV)?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Wright Business Centre - 0112 (FOR EV)?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh (~£26 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Wright Business Centre - 0112 (FOR EV)?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh (~£33 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: FOR EV · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.