# Fraser Group Plc

Web page: https://ampmap.co.uk/charger/fraser-group-plc-uk

Fraser Group Plc is an EV charging site in Mansfield Woodhouse, Nottinghamshire, run by Fraser Group Plc and open 24 hours a day. It has a single 7 kW Type 2 socket. Recorded live status shows it is usually busiest around 3 pm, and Amp Map measured 100% uptime and recorded 9 charging sessions here over the last 30 days.

## Status

1 of 1 open at 22 Nov 2026, 14:15 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** 3, NG20 8RY
- **Area:** Mansfield Woodhouse, Nottinghamshire, United Kingdom
- **Coordinates (latitude, longitude):** 53.19694, -1.20403

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| Type 2 | 7 kW | 1 | Not listed | 1 free |

## Site information

- **Operator:** Fraser Group Plc
- **Opening hours:** Open 24 hours
- **Payment:** In the operator's app; RFID card

## Common questions

### How fast is charging at Fraser Group Plc?

Up to 7 kW AC via Type 2.

### How many charging sockets does Fraser Group Plc have?

1 charging socket: 1 × 7 kW Type 2. Live per-socket availability is shown on this page.

### Is Fraser Group Plc open 24/7?

Yes - Fraser Group Plc is open 24 hours a day, 7 days a week.

### When is Fraser Group Plc busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 3 pm and quietest around 7 am. The live status on this page shows what is free before you set off.

### How reliable is Fraser Group Plc?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 9 observed charging sessions.

### Who operates Fraser Group Plc?

Fraser Group Plc is on the Fraser Group Plc network.

### How long does a Tesla Model Y Long Range take to charge at Fraser Group Plc?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Fraser Group Plc?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Fraser Group Plc?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Mansfield Woodhouse](https://ampmap.co.uk/chargers/united-kingdom/nottinghamshire/mansfield-woodhouse)

## Chargers near this site

- [Fraser Group Plc](https://ampmap.co.uk/charger/fraser-group-plc-2-uk) - Type 2 7 kW · 3, Maiden Road
- [S&L Office · VIRTA](https://ampmap.co.uk/charger/virta-s-and-l-office-uk) - Type 2 22 kW · Leeming Lane North Leeming Lane North
- [CCUK EV Limited](https://ampmap.co.uk/charger/ccuk-ev-limited-uk) - Type 2 7 kW · NG19 8LJ
- [Enterprise Way · InstaVolt Ltd](https://ampmap.co.uk/charger/instavolt-ltd-enterprise-way-uk) - CCS 100 kW, CHAdeMO 100 kW · Enterprise Way
- [Shell Recharge EV Aldi - Mansfield](https://ampmap.co.uk/charger/shell-recharge-ev-aldi-mansfield-uk) - CCS 150 kW · Leeming Ln S, Mansfield Woodhouse · From 85p/kWh
- [The Rufford, Mansfield · Osprey Charging](https://ampmap.co.uk/charger/osprey-charging-rufford-pub-and-restaurant-uk) - CCS 50 kW, CHAdeMO 50 kW · 335 Chesterfield Rd S, Mansfield NG19 7ES · From 89p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/fraser-group-plc-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Fraser Group Plc (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.
