Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Fuuse · EV charging site

Botcherby Community Centre

Victoria Road, Carlisle, CA1 2UE

Botcherby Community Centre is an EV charging site in Carlisle, Cumbria, run by Fuuse. It has a single socket, with Type 2 at up to 22 kW. 11 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Lidi (Lidl), 90 yards away.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 5 Apr 2026Last verified 5 Apr 2026

Connectors

Type 2 · 22 kW2 connectors

Site information

Operator
Fuuse
Opening hours
Not published
Access
Public
Phone (from Open Charge Map)
+44 333 050 4950
Getting there
NOT 24 Hours

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 22 kW Type 2~5h 2m
Tesla Model 3 Rear-Wheel Drive 10–80% · 22 kW Type 2~3h 38m
Audi Q4 e-tron 50 10–80% · 22 kW Type 2~4h 39m
Hyundai IONIQ 5 10–80% · 22 kW Type 2~4h 37m
MG Motor MG4 Trophy 10–80% · 22 kW Type 2~3h 53m
Hyundai Kona Electric Long Range 10–80% · 22 kW Type 2~5h 38m
Nissan LEAF 10–80% · 22 kW Type 2~4h 15m

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How fast is charging at Botcherby Community Centre (Fuuse)?

Up to 22 kW AC via Type 2.

How many charging sockets does Botcherby Community Centre (Fuuse) have?

1 charging socket: 1 × 22 kW Type 2, 1 × 22 kW Type 2.

Who operates Botcherby Community Centre?

Botcherby Community Centre is on the Fuuse network. For site issues, the operator lists +44 333 050 4950.

Where is the nearest charger with 50 kW or more to Botcherby Community Centre (Fuuse)?

Lidi (Lidl) is 90 yards away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Botcherby Community Centre (Fuuse)?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Botcherby Community Centre (Fuuse)?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Botcherby Community Centre (Fuuse)?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 5 Apr 2026

Amp Map does not take payment. You pay the operator.