Fuuse · EV charging site
Checkley Wood
Watling Street, Leighton Buzzard, LU7 9RG
Checkley Wood is an EV charging site in Leighton Buzzard, Central Bedfordshire, run by Fuuse. All 18 of its sockets are 100 kW CCS, and the price is listed as £0.79/kWh. No other charging site is listed within a mile, and the nearest other site with 50 kW or more is Morrisons Leighton Buzzard (GeniePoint), 3.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Fuuse
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- £0.79/kWh(from Open Charge Map, 10 Jun 2024)
- Phone (from Open Charge Map)
- +44 333 050 4950
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Checkley Wood (Fuuse)?
The listed price is £0.79/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Checkley Wood (Fuuse)?
Up to 100 kW DC via CCS.
How many charging sockets does Checkley Wood (Fuuse) have?
18 charging sockets: 18 × 100 kW CCS.
Who operates Checkley Wood?
Checkley Wood is on the Fuuse network. For site issues, the operator lists +44 333 050 4950.
Where is the nearest other charger with 50 kW or more to Checkley Wood (Fuuse)?
Morrisons Leighton Buzzard (GeniePoint) is 3.1 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Checkley Wood (Fuuse)?
A typical 10–80% rapid charge takes about 36 min on the 100 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Checkley Wood (Fuuse)?
A typical 10–80% rapid charge takes about 29 min on the 100 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Checkley Wood (Fuuse)?
A typical 10–80% rapid charge takes about 43 min on the 100 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Leighton Buzzard
- Pod Point Leighton Leisure & Community Centre
- OCPP22100005
- Pod Point Marigold House
- Baker Street
- Central Bedfordshire Council
- Cheapest nearby
- Pod Point Leighton Leisure & Community Centre · 50.4p per kWh · 7 kW · 2 mi