Fuuse · EV charging site
EG Capel St Mary Starbucks
A12 Southbound, Ipswich, IP9 2JP
EG Capel St Mary Starbucks is an EV charging site in Ipswich, Suffolk, run by Fuuse. It has a single socket, with CHAdeMO and CCS at up to 50 kW. 1 other charging site is listed within a mile, and the nearest other site with 50 kW or more is Bypass Nurseries Garden Centre, Ipswich (Osprey Charging), 0.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Fuuse
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Phone (from Open Charge Map)
- +44 333 050 4950
- Notes
- Branded as 'evpoint'
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at EG Capel St Mary Starbucks (Fuuse)?
Up to 50 kW DC via CHAdeMO, Type 2, CCS.
How many charging sockets does EG Capel St Mary Starbucks (Fuuse) have?
1 charging socket: 1 × 50 kW CHAdeMO, 1 × 22 kW Type 2, 1 × 50 kW CCS.
Who operates EG Capel St Mary Starbucks?
EG Capel St Mary Starbucks is on the Fuuse network. For site issues, the operator lists +44 333 050 4950.
Where is the nearest other charger with 50 kW or more to EG Capel St Mary Starbucks (Fuuse)?
Bypass Nurseries Garden Centre, Ipswich (Osprey Charging) is 0.4 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at EG Capel St Mary Starbucks (Fuuse)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at EG Capel St Mary Starbucks (Fuuse)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at EG Capel St Mary Starbucks (Fuuse)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Bypass Nurseries Garden Centre, Ipswich
- Pod Point Ipswich Best Western
- Ipswich Park & Ride - London Road, Ipswich
- Pod Point Tesco Extra - Ipswich
- PIS Stutton
- Milsomhotels Station M
- Cheapest nearby
- Pod Point Tesco Extra - Ipswich · 44.4p per kWh · 7 kW · 3 mi
- Fastest nearby
- Bypass Nurseries Garden Centre, Ipswich · 150 kW · 0.4 mi