Fuuse · EV charging site
EG Kinmel Park East
A55 Expressway Eastbound, Rhyl, LL18 5XW
EG Kinmel Park East is an EV charging site in Rhyl, Denbighshire, run by Fuuse. Its 2 sockets reach up to 50 kW, with CHAdeMO and CCS at the top speed, and the price is listed as £0.55/kWh. 1 other charging site is listed within a mile, and the nearest other site with 50 kW or more is EG Kinmel Park West (Fuuse), 0.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Fuuse
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- £0.55/kWh(from Open Charge Map, 11 Oct 2023)
- Phone (from Open Charge Map)
- +44 333 050 4950
- Notes
- Branded as 'evpoint'
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at EG Kinmel Park East (Fuuse)?
The listed price is £0.55/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at EG Kinmel Park East (Fuuse)?
Up to 50 kW DC via CHAdeMO, Type 2, CCS.
How many charging sockets does EG Kinmel Park East (Fuuse) have?
2 charging sockets: 1 × 50 kW CHAdeMO, 1 × 22 kW Type 2, 1 × 50 kW CCS, 1 × 50 kW CCS, 1 × 50 kW CHAdeMO, 1 × 22 kW Type 2.
Who operates EG Kinmel Park East?
EG Kinmel Park East is on the Fuuse network. For site issues, the operator lists +44 333 050 4950.
Where is the nearest other charger with 50 kW or more to EG Kinmel Park East (Fuuse)?
EG Kinmel Park West (Fuuse) is 0.2 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at EG Kinmel Park East (Fuuse)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at EG Kinmel Park East (Fuuse)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at EG Kinmel Park East (Fuuse)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- EG Kinmel Park West
- Glasfryn parc
- Pod Point NWSSP - Alder House
- Shell Recharge Shell Threeways
- Ty Gwyn Caravan Park
- Talardy Hotel, Saint Asaph
- Cheapest nearby
- Pod Point NWSSP - Alder House · Free · 7 kW · 1.8 mi
- Fastest nearby
- Shell Recharge Shell Threeways · 400 kW · 2.5 mi