Fuuse · EV charging site
EG Singing Kettle
St Asaph Road, Prestatyn, CH8 8RF
EG Singing Kettle is an EV charging site in Prestatyn, Denbighshire, run by Fuuse. Its 2 sockets reach up to 50 kW, with CHAdeMO and CCS at the top speed. 1 other charging site is listed within a mile, and the nearest other site with 50 kW or more is IONITY GmbH IONITY Holywell, 50 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Fuuse
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Phone (from Open Charge Map)
- +44 333 050 4950
- Notes
- Old Ecotricity Electric Highway Unit replaced with one run on the Fuuse network under the 'evpoint' branding.
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at EG Singing Kettle (Fuuse)?
Up to 50 kW DC via CHAdeMO, Type 2, CCS.
How many charging sockets does EG Singing Kettle (Fuuse) have?
2 charging sockets: 1 × 50 kW CHAdeMO, 1 × 22 kW Type 2, 1 × 50 kW CCS.
Who operates EG Singing Kettle?
EG Singing Kettle is on the Fuuse network. For site issues, the operator lists +44 333 050 4950.
Where is the nearest other charger with 50 kW or more to EG Singing Kettle (Fuuse)?
IONITY GmbH IONITY Holywell is 50 yards away in a straight line, with up to 400 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at EG Singing Kettle (Fuuse)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at EG Singing Kettle (Fuuse)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at EG Singing Kettle (Fuuse)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Cheapest nearby
- IONITY GmbH IONITY Holywell · 83.3p per kWh · 400 kW · 50 yd
- Fastest nearby
- IONITY GmbH IONITY Holywell · 400 kW · 50 yd