# EG Singing Kettle · Fuuse

Web page: https://ampmap.co.uk/charger/fuuse-eg-singing-kettle-uk

EG Singing Kettle is an EV charging site in Prestatyn, Denbighshire, run by Fuuse. Its 2 sockets reach up to 50 kW, with CHAdeMO and CCS at the top speed.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** St Asaph Road, CH8 8RF
- **Area:** Prestatyn, Denbighshire, United Kingdom
- **Coordinates (latitude, longitude):** 53.27369, -3.30547

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 50 kW | 1 | Not listed |
| CHAdeMO | 50 kW | 1 | Not listed |
| Type 2 | 22 kW | 1 | Not listed |

## Site information

- **Operator:** Fuuse
- **Opening hours:** Not published
- **Access:** Public
- **Payment:** Pay at the charger (from Open Charge Map)
- **Notes:** Old Ecotricity Electric Highway Unit replaced with one run on the Fuuse network under the 'evpoint' branding.

## Common questions

### How fast is charging at EG Singing Kettle (Fuuse)?

Up to 50 kW DC via CHAdeMO, Type 2, CCS.

### How many charging sockets does EG Singing Kettle (Fuuse) have?

2 charging sockets: 1 × 50 kW CHAdeMO, 1 × 22 kW Type 2, 1 × 50 kW CCS.

### Who operates EG Singing Kettle?

EG Singing Kettle is on the Fuuse network. For site issues, the operator lists +44 333 050 4950.

### How long does a Tesla Model Y Long Range take to charge at EG Singing Kettle (Fuuse)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at EG Singing Kettle (Fuuse)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at EG Singing Kettle (Fuuse)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Prestatyn](https://ampmap.co.uk/chargers/united-kingdom/denbighshire/prestatyn)
- [Fuuse chargers](https://ampmap.co.uk/networks/fuuse)

## Chargers near this site

- [IONITY GmbH IONITY Holywell](https://ampmap.co.uk/charger/ionity-gmbh-ionity-holywell-uk) - CCS 400 kW, CCS 350 kW · A55 Saint Asaph Road, Junction 31 · From 83.3p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/fuuse-eg-singing-kettle-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 16 Aug 2023).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
