Fuuse · EV charging site
Garlogie Inn
Garlogie, Aberdeen, AB32 6RX
Garlogie Inn is an EV charging site in Aberdeen, Aberdeen City, run by Fuuse. Both of its sockets are 22 kW Type 2, and the price is listed as £0.75/kWh+£0.50/connection. No other charging site is listed within a mile, and the nearest site with 50 kW or more is Pod Point Tesco Superstore - Westhill, 3.8 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Fuuse
- Opening hours
- Not published
- Access
- Public
- Price
- £0.75/kWh+£0.50/connection(from Open Charge Map, 29 Jul 2024)
- Phone (from Open Charge Map)
- +44 333 050 4950
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Garlogie Inn (Fuuse)?
The listed price is £0.75/kWh+£0.50/connection. Prices can change, so check the price at the charger before you start.
How fast is charging at Garlogie Inn (Fuuse)?
Up to 22 kW AC via Type 2.
How many charging sockets does Garlogie Inn (Fuuse) have?
2 charging sockets: 1 × 22 kW Type 2, 1 × 22 kW Type 2.
Who operates Garlogie Inn?
Garlogie Inn is on the Fuuse network. For site issues, the operator lists +44 333 050 4950.
Where is the nearest charger with 50 kW or more to Garlogie Inn (Fuuse)?
Pod Point Tesco Superstore - Westhill is 3.8 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Garlogie Inn (Fuuse)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Garlogie Inn (Fuuse)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Garlogie Inn (Fuuse)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Cheapest nearby
- Mains of Drum Garden Centre - 0173 · 75p per kWh · 200 kW · 3.8 mi
- Fastest nearby
- Mains of Drum Garden Centre - 0173 · 200 kW · 3.8 mi