Fuuse · EV charging site
Hatherleigh Car Park
Market Way, Hatherleigh, EX20 3FB
Hatherleigh Car Park is an EV charging site in Hatherleigh, Devon, run by Fuuse. Both of its sockets are 22 kW Type 2, and the price is listed as £0.65/kWh. No other charging site is listed within a mile, and the nearest site with 50 kW or more is Sydney House Car Park (GeniePoint), 9.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Fuuse
- Opening hours
- Not published
- Access
- Public
- Price
- £0.65/kWh(from Open Charge Map, 13 Feb 2024)
- Phone (from Open Charge Map)
- +44 333 050 4950
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Hatherleigh Car Park (Fuuse)?
The listed price is £0.65/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Hatherleigh Car Park (Fuuse)?
Up to 22 kW AC via Type 2.
How many charging sockets does Hatherleigh Car Park (Fuuse) have?
2 charging sockets: 1 × 22 kW Type 2, 1 × 22 kW Type 2.
Who operates Hatherleigh Car Park?
Hatherleigh Car Park is on the Fuuse network. For site issues, the operator lists +44 333 050 4950.
Where is the nearest charger with 50 kW or more to Hatherleigh Car Park (Fuuse)?
Sydney House Car Park (GeniePoint) is 9.5 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Hatherleigh Car Park (Fuuse)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Hatherleigh Car Park (Fuuse)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Hatherleigh Car Park (Fuuse)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.