Fuuse · EV charging site
M61
M61, Horwich, BL6 5UZ
M61 is an EV charging site in Horwich, Borough of Bolton (BL6 5UZ), run by Fuuse. Its 6 sockets reach up to 180 kW, with CCS at the top speed, and the price is listed as £0.65/kWh. 1 other charging site is listed within a mile, and the nearest other site with 50 kW or more is Rivington Services Northbound (evPoint) (EG Group EV Point), 0.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Fuuse
- Opening hours
- Not published
- Access
- Public
- Price
- £0.65/kWh(from Open Charge Map, 23 Jul 2024)
- Phone (from Open Charge Map)
- +44 333 050 4950
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at M61 (Fuuse)?
The listed price is £0.65/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at M61 (Fuuse)?
Up to 180 kW DC via CCS, CHAdeMO.
How many charging sockets does M61 (Fuuse) have?
6 charging sockets: 1 × 180 kW CCS, 1 × 80 kW CHAdeMO, 1 × 180 kW CCS, 1 × 80 kW CHAdeMO, 1 × 180 kW CCS, 1 × 180 kW CCS, 1 × 180 kW CCS, 1 × 180 kW CCS, 1 × 180 kW CCS, 1 × 180 kW CCS, 1 × 180 kW CCS, 1 × 80 kW CHAdeMO.
Who operates M61?
M61 is on the Fuuse network. For site issues, the operator lists +44 333 050 4950.
Where is the nearest other charger with 50 kW or more to M61 (Fuuse)?
Rivington Services Northbound (evPoint) (EG Group EV Point) is 0.1 miles away in a straight line, with up to 60 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at M61 (Fuuse)?
A typical 10–80% rapid charge takes about 24 min on the 180 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at M61 (Fuuse)?
A typical 10–80% rapid charge takes about 23 min on the 180 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at M61 (Fuuse)?
A typical 10–80% rapid charge takes about 39 min on the 180 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Rivington Services Northbound (evPoint)
- Wright Street Car Park - Horwich
- Horwich Service Station
- Retreat Adlington
- Middlebrook Retail & Leisure Par
- Bolton Stadium Hotel
- Cheapest nearby
- Wright Street Car Park - Horwich · 59p per kWh · 7 kW · 1.1 mi