Fuuse · EV charging site
Wem Business Park
New Street, Shrewsbury
Wem Business Park is an EV charging site in Shrewsbury, Shropshire, run by Fuuse. It has a single 150 kW CCS socket. 1 other charging site is listed within a mile, and the nearest other site with 50 kW or more is Pod Point Tesco Extra - Shrewsbury, 8.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Fuuse
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- +44 333 050 4950
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Wem Business Park (Fuuse)?
Up to 150 kW DC via CCS.
How many charging sockets does Wem Business Park (Fuuse) have?
1 charging socket: 2 × 150 kW CCS.
Who operates Wem Business Park?
Wem Business Park is on the Fuuse network. For site issues, the operator lists +44 333 050 4950.
Where is the nearest other charger with 50 kW or more to Wem Business Park (Fuuse)?
Pod Point Tesco Extra - Shrewsbury is 8.2 miles away in a straight line, with up to 75 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Wem Business Park (Fuuse)?
A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Wem Business Park (Fuuse)?
A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Wem Business Park (Fuuse)?
A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.