Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Fuuse · EV charging site

Wem Business Park

New Street, Shrewsbury

Wem Business Park is an EV charging site in Shrewsbury, Shropshire, run by Fuuse. It has a single 150 kW CCS socket. 1 other charging site is listed within a mile, and the nearest other site with 50 kW or more is Pod Point Tesco Extra - Shrewsbury, 8.2 miles away.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 2 Oct 2024Last verified 2 Oct 2024

Connectors

CCS · 150 kW2 connectors

Site information

Operator
Fuuse
Opening hours
Not published
Access
Public
Phone (from Open Charge Map)
+44 333 050 4950

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 150 kW CCS~27 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 150 kW CCS~24 min
Audi Q4 e-tron 50 10–80% · 150 kW CCS~39 min
Hyundai IONIQ 5 10–80% · 150 kW CCS~23 min
MG Motor MG4 Trophy 10–80% · 150 kW CCS~30 min
Hyundai Kona Electric Long Range 10–80% · 150 kW CCS~39 min

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How fast is charging at Wem Business Park (Fuuse)?

Up to 150 kW DC via CCS.

How many charging sockets does Wem Business Park (Fuuse) have?

1 charging socket: 2 × 150 kW CCS.

Who operates Wem Business Park?

Wem Business Park is on the Fuuse network. For site issues, the operator lists +44 333 050 4950.

Where is the nearest other charger with 50 kW or more to Wem Business Park (Fuuse)?

Pod Point Tesco Extra - Shrewsbury is 8.2 miles away in a straight line, with up to 75 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Wem Business Park (Fuuse)?

A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Wem Business Park (Fuuse)?

A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Wem Business Park (Fuuse)?

A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 2 Oct 2024

Amp Map does not take payment. You pay the operator.