Fuuse · EV charging site
Westmorland Street Car Park
Westmorland Street Car Park, Carlisle, CA2 5HH
Westmorland Street Car Park is an EV charging site in Carlisle, Cumbria, run by Fuuse. Both of its sockets are 22 kW Type 2. 16 other charging sites are listed within a mile, and the nearest site with 50 kW or more is St Nicholas Retail Park (InstaVolt Ltd), 0.8 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Fuuse
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Phone (from Open Charge Map)
- +44 333 050 4950
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Westmorland Street Car Park (Fuuse)?
Up to 22 kW AC via Type 2.
How many charging sockets does Westmorland Street Car Park (Fuuse) have?
2 charging sockets: 1 × 22 kW Type 2, 1 × 22 kW Type 2.
Who operates Westmorland Street Car Park?
Westmorland Street Car Park is on the Fuuse network. For site issues, the operator lists +44 333 050 4950.
Where is the nearest charger with 50 kW or more to Westmorland Street Car Park (Fuuse)?
St Nicholas Retail Park (InstaVolt Ltd) is 0.8 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Westmorland Street Car Park (Fuuse)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Westmorland Street Car Park (Fuuse)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Westmorland Street Car Park (Fuuse)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Linton Tweeds
- Pod Point Venuscare Ltd
- Milbourne Street
- Pod Point Citadel Car Park
- Wigton Road Car Par
- Paddys Market Car Park
- Cheapest nearby
- Pod Point Citadel Car Park · 30p per kWh · 7 kW · 0.5 mi