Glebe Barn Weddings · EV charging site
Glebe Barn Weddings
Glebe Barn Weddings, Holsworthy, EX22 7EW
Glebe Barn Weddings is an EV charging site in Holsworthy, Devon, run by Glebe Barn Weddings and open 24 hours a day. Both of its sockets are 7 kW Type 2. Recorded live status shows it is usually busiest around 5 pm, and Amp Map measured 100% uptime and recorded 1 charging session here over the last 30 days. No other charging site is listed within a mile, and the nearest site with 50 kW or more is Holsworthy SF Connect (BP Pulse), 4 miles away.
Status
2 of 2 available
Checking status…
Connectors
Type 2 · 7 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- Glebe Barn Weddings
- Opening hours
- Open 24 hours
- Payment
- In the operator's appRFID card
- Charger ID
- hand charger
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Glebe Barn Weddings?
Up to 7 kW AC via Type 2.
How many charging sockets does Glebe Barn Weddings have?
2 charging sockets: 2 × 7 kW Type 2. Live per-socket availability is shown on this page.
Is Glebe Barn Weddings open 24/7?
Yes - Glebe Barn Weddings is open 24 hours a day, 7 days a week.
When is Glebe Barn Weddings busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 5 pm and quietest around 11 am. The live status on this page shows what is free before you set off.
How reliable is Glebe Barn Weddings?
Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 1 observed charging session.
Who operates Glebe Barn Weddings?
Glebe Barn Weddings is on the Glebe Barn Weddings network.
Where is the nearest charger with 50 kW or more to Glebe Barn Weddings?
Holsworthy SF Connect (BP Pulse) is 4 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Glebe Barn Weddings?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Glebe Barn Weddings?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Glebe Barn Weddings?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Cheapest nearby
- Pod Point Well Farm Cottages · 50.4p per kWh · 7 kW · 4 mi