Go Zero · EV charging site
Brockencote Hall Hotel, Kidderminster ( Eden Hotels)
Brockencote Hall Hotel, Kidderminster, DY10 4PY
Brockencote Hall Hotel, Kidderminster ( Eden Hotels) is an EV charging site in Kidderminster, Worcestershire, run by Go Zero. All 3 of its sockets are 7 kW Type 2. No other charging site is listed within a mile, and the nearest site with 50 kW or more is Viaduct Tavern, Kidderminster (Osprey Charging), 3.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Go Zero
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Brockencote Hall Hotel, Kidderminster ( Eden Hotels) (Go Zero)?
Up to 7 kW AC via Type 2.
How many charging sockets does Brockencote Hall Hotel, Kidderminster ( Eden Hotels) (Go Zero) have?
3 charging sockets: 1 × 7 kW Type 2, 1 × 7 kW Type 2, 1 × 7 kW Type 2.
Who operates Brockencote Hall Hotel, Kidderminster ( Eden Hotels)?
Brockencote Hall Hotel, Kidderminster ( Eden Hotels) is on the Go Zero network.
Where is the nearest charger with 50 kW or more to Brockencote Hall Hotel, Kidderminster ( Eden Hotels) (Go Zero)?
Viaduct Tavern, Kidderminster (Osprey Charging) is 3.4 miles away in a straight line, with up to 75 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Brockencote Hall Hotel, Kidderminster ( Eden Hotels) (Go Zero)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Brockencote Hall Hotel, Kidderminster ( Eden Hotels) (Go Zero)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Brockencote Hall Hotel, Kidderminster ( Eden Hotels) (Go Zero)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Pod Point Hogarths Stone Manor LTD
- Viaduct Tavern, Kidderminster
- Pod Point LNWMR - Kidderminster Station
- Land Oak, Kidderminster
- Morrisons Kidderminster
- The Bell (M & B) Stourbridge
- Cheapest nearby
- Pod Point LNWMR - Kidderminster Station · 42p per kWh · 7 kW · 3.6 mi
- Fastest nearby
- Viaduct Tavern, Kidderminster · 75 kW · 3.4 mi