Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Go Zero · EV charging site

Cobleland Campsite

Cobleland Caravan & Camping Site, Balfron, FK8 3RR

Cobleland Campsite is an EV charging site in Balfron, Stirling, run by Go Zero. All 4 of its sockets are 7 kW Type 2. No other charging site is listed within a mile, and the nearest site with 50 kW or more is Riverside Car Park (Chargeplace Scotland), 1.8 miles away.

Status

Out of service

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 25 Sept 2026Last verified 25 Sept 2026

Connectors

Type 2 · 7 kW4 connectors

Site information

Operator
Go Zero
Opening hours
Not published
Access
Public · membership required · access key required

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 7 kW Type 2~7h 54m
Tesla Model 3 Rear-Wheel Drive 10–80% · 7 kW Type 2~5h 42m
Audi Q4 e-tron 50 10–80% · 7 kW Type 2~7h 18m
Hyundai IONIQ 5 10–80% · 7 kW Type 2~7h 16m
MG Motor MG4 Trophy 10–80% · 7 kW Type 2~6h 6m
Hyundai Kona Electric Long Range 10–80% · 7 kW Type 2~5h 48m
Nissan LEAF 10–80% · 7 kW Type 2~4h 15m

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How fast is charging at Cobleland Campsite (Go Zero)?

Up to 7 kW AC via Type 2.

How many charging sockets does Cobleland Campsite (Go Zero) have?

4 charging sockets: 1 × 7 kW Type 2, 1 × 7 kW Type 2, 1 × 7 kW Type 2, 1 × 7 kW Type 2.

Who operates Cobleland Campsite?

Cobleland Campsite is on the Go Zero network.

Where is the nearest charger with 50 kW or more to Cobleland Campsite (Go Zero)?

Riverside Car Park (Chargeplace Scotland) is 1.8 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Cobleland Campsite (Go Zero)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Cobleland Campsite (Go Zero)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Cobleland Campsite (Go Zero)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 25 Sept 2026