Go Zero · EV charging site
Ingliston Country Club and Hotel
Ingliston Country Club, Dumbarton, PA7 5PA
Ingliston Country Club and Hotel is an EV charging site in Dumbarton, West Dunbartonshire, run by Go Zero. All 6 of its sockets are 22 kW Type 2. No other charging site is listed within a mile, and the nearest site with 50 kW or more is Milton SF Connect (BP Pulse), 1.6 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Go Zero
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Ingliston Country Club and Hotel (Go Zero)?
Up to 22 kW AC via Type 2.
How many charging sockets does Ingliston Country Club and Hotel (Go Zero) have?
6 charging sockets: 1 × 22 kW Type 2, 1 × 22 kW Type 2, 1 × 22 kW Type 2, 1 × 22 kW Type 2, 1 × 22 kW Type 2, 1 × 22 kW Type 2.
Who operates Ingliston Country Club and Hotel?
Ingliston Country Club and Hotel is on the Go Zero network.
Where is the nearest charger with 50 kW or more to Ingliston Country Club and Hotel (Go Zero)?
Milton SF Connect (BP Pulse) is 1.6 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Ingliston Country Club and Hotel (Go Zero)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Ingliston Country Club and Hotel (Go Zero)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Ingliston Country Club and Hotel (Go Zero)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Milton SF Connect
- Morrisons
- Church Street Car Park
- Churchcourt Park and Ride
- Park Mains High School
- Erskine Swimming Pool
- Fastest nearby
- Milton SF Connect · 150 kW · 1.6 mi