Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Go Zero · EV charging site

Oasis Sands

Oasis Sands, Newquay, TR7 3ND

Oasis Sands is an EV charging site in Newquay, Cornwall, run by Go Zero. All 4 of its sockets are 7 kW Type 2. 2 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Albany Road Car Park (POGO), 1.1 miles away.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 25 Sept 2026Last verified 25 Sept 2026

Connectors

Type 2 · 7 kW4 connectors

Site information

Operator
Go Zero
Opening hours
Not published
Access
Public · membership required · access key required

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 7 kW Type 2~7h 54m
Tesla Model 3 Rear-Wheel Drive 10–80% · 7 kW Type 2~5h 42m
Audi Q4 e-tron 50 10–80% · 7 kW Type 2~7h 18m
Hyundai IONIQ 5 10–80% · 7 kW Type 2~7h 16m
MG Motor MG4 Trophy 10–80% · 7 kW Type 2~6h 6m
Hyundai Kona Electric Long Range 10–80% · 7 kW Type 2~5h 48m
Nissan LEAF 10–80% · 7 kW Type 2~4h 15m

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How fast is charging at Oasis Sands (Go Zero)?

Up to 7 kW AC via Type 2.

How many charging sockets does Oasis Sands (Go Zero) have?

4 charging sockets: 1 × 7 kW Type 2, 1 × 7 kW Type 2, 1 × 7 kW Type 2, 1 × 7 kW Type 2.

Who operates Oasis Sands?

Oasis Sands is on the Go Zero network.

Where is the nearest charger with 50 kW or more to Oasis Sands (Go Zero)?

Albany Road Car Park (POGO) is 1.1 miles away in a straight line, with up to 150 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Oasis Sands (Go Zero)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Oasis Sands (Go Zero)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Oasis Sands (Go Zero)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 25 Sept 2026