EV charging site
Golden Days Garden Centre
Back Lane, Skelmersdale, WN6 8RS
Golden Days Garden Centre is an EV charging site in Skelmersdale, Lancashire. All 4 of its sockets are 120 kW CCS, and the price is listed as £0.65/kWh. 2 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is MFG BP/Costa Crow Orchard Service Station (MFG EV Power), 0.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- £0.65/kWh(from Open Charge Map, 20 Aug 2025)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Golden Days Garden Centre?
The listed price is £0.65/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Golden Days Garden Centre?
Up to 120 kW DC via CCS.
How many charging sockets does Golden Days Garden Centre have?
4 charging sockets: 4 × 120 kW CCS.
Where is the nearest other charger with 50 kW or more to Golden Days Garden Centre?
MFG BP/Costa Crow Orchard Service Station (MFG EV Power) is 0.2 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Golden Days Garden Centre?
A typical 10–80% rapid charge takes about 31 min on the 120 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Golden Days Garden Centre?
A typical 10–80% rapid charge takes about 26 min on the 120 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Golden Days Garden Centre?
A typical 10–80% rapid charge takes about 40 min on the 120 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- MFG BP/Costa Crow Orchard Service Station
- 41 Shevington Moor
- Miller & Carter Parbold
- Charnock Richard, UK - Northbound
- Applegreen Electric Charnock Richard Northbound
- Charnock Richard, UK - Southbound
- Cheapest nearby
- Charnock Richard, UK - Southbound · 56p per kWh · 250 kW · 3 mi
- Fastest nearby
- Charnock Richard, UK - Southbound · 250 kW · 3 mi