# Gormley Motors

Web page: https://ampmap.co.uk/charger/gormley-motors-uk

Gormley Motors is an EV charging site in Dungannon, Mid Ulster, run by Gormley Motors and open Mon–Fri 17:00–07:00. It has a single 22 kW Type 2 socket. Recorded live status shows it is usually busiest around 6 pm, and Amp Map measured 100% uptime and recorded 1 charging session here over the last 30 days.

## Status

1 of 1 open at 22 Nov 2026, 16:11 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** 17 Ballygawley Rd, BT71 7BU
- **Area:** Dungannon, Mid Ulster, United Kingdom
- **Coordinates (latitude, longitude):** 54.50336, -6.78070
- **Parking:** Car park

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| Type 2 | 22 kW | 1 | Not listed | 1 free |

## Site information

- **Operator:** Gormley Motors
- **Opening hours:** Mon–Fri 17:00–07:00
- **Payment:** In the operator's app; RFID card

## Common questions

### How fast is charging at Gormley Motors?

Up to 22 kW AC via Type 2.

### How many charging sockets does Gormley Motors have?

1 charging socket: 1 × 22 kW Type 2. Live per-socket availability is shown on this page.

### When is Gormley Motors open?

Opening hours: Mon–Fri 17:00–07:00.

### When is Gormley Motors busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 6 pm and quietest around 6 am. The live status on this page shows what is free before you set off.

### How reliable is Gormley Motors?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 1 observed charging session.

### Who operates Gormley Motors?

Gormley Motors is on the Gormley Motors network.

### How long does a Tesla Model Y Long Range take to charge at Gormley Motors?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Gormley Motors?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Gormley Motors?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Dungannon](https://ampmap.co.uk/chargers/united-kingdom/mid-ulster/dungannon)

## Chargers near this site

- [Pod Point Tesco Superstore - Dungannon](https://ampmap.co.uk/charger/pod-point-tesco-superstore-dungannon-uk) - Type 2 7 kW · Beech Vly · From 44.4p/kWh
- [DRD Car Park Scotch Street South · ESB Ecars](https://ampmap.co.uk/charger/esb-ecars-drd-car-park-scotch-street-south-uk) - Type 2 22 kW · 8-9 Scotch Street Centre
- [South Tyrone Hospital · Weev](https://ampmap.co.uk/charger/bmm-energy-south-tyrone-hospital-uk) - Type 2 22 kW · Carland Road
- [Oak Shopping Centre, Dungannon · ESB Ecars](https://ampmap.co.uk/charger/esb-ecars-oak-shopping-centre-dungannon-uk) - Type 2 22 kW · Oaks Shopping Centre, Oaks Road, Dungannon
- [HRL Ranfurly · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-hrl-ranfurly-uk) - CCS 150 kW · 20 Moy Road
- [Dungannon, UK · Tesla](https://ampmap.co.uk/charger/tesla-dungannon-supercharger-uk) - CCS 250 kW · The Linen Green, Main Rd · From 25p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/gormley-motors-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Gormley Motors (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.
